Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
2% of nearby decided applications were refused. The site check found 127 decisions within 5 km, 1 exact-site or onsite candidate record, and 2 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matched1 of 2 layers are loaded for Leitrim County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedNo verified rural-housing citation is loaded for Leitrim County Council, so this brief makes no current policy claim and relies on decision history.
2 of 4 layers are loaded for Leitrim County Council and were intersected with the site; flood and built heritage are not loaded and no conclusion is drawn for them.
2 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
2 structured nearby appeal records.
2 matchedNo current-dated citation is loaded for Leitrim County Council. Historic references extracted from decisions are never presented as current policy.
Open preview
Open preview
Development consisting of the construction of a new dwelling house and domestic garage, access to the public road, connection to existing public services and all associated development works
Retain (a) 1 metal shed, (b) one single storey sunroom, and (c) one rear garden pergola structure
Retain amended site boundaries to house No. 2 which have been enlarged by the incorporation of part of the green space into the curtilage of the house in lieu of Permission to amend site boundaries to house No. 2 so as to enlarge the site by incorporating part of the green space into the curtilage of the house
Demolish an existing dwelling. To construct a two storey type domestic dwelling on the same footprint of the dwelling to be demolished To construct a new domestic garage. To upgrade the existing site entrance and connect to all public services, and all ancillary works
Retention of (a) to retain elevational changes to the side and rear of the existing dwelling from that previously approved under planning reference no. PD/06/1220, and Permission for (a) internal renovations and elevational changes to the existing dwelling house together with the construction of a part two storey and part single storey extension to the rear/side of the existing dwelling, along with the construction of a canopy structure to the front and rear (b) the construction of a domestic shed/garage (c) along with all other associated site works
1. To construct a single storey domestic extension. 2. To retain amended site boundaries as granted under parent planning ref. 06/1220. 3. To make elevational changes to both side gables and the front elevation of the existing domestic dwelling. 4. To remove an existing pitched roof and replace same with a flat roof over an existing sunroom. 5. To connect to all existing services and all ancillary works.
The brief summarizes the pattern across all 127 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 2096The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief