To construct an extension to the existing test centre (158 sqm) for the purpose of servicing vehicles. Gross floor space of proposed works: 158 sqm
Site planning risk brief
Search a place or planning reference, choose the development type, then preview the report before getting the full site brief.Site planning risk brief
Sylaun ,
One-off house / within 5 km where a location match is available
Executive snapshot
Local planning pattern
20% of nearby decided applications were refused. The preview found 619 nearby planning records within 5 km where a location match is available.
- Matched source
- 21170
- Project type
- One-off house
- Coverage
- 5 km radius
Open preview
Top refusal reasons nearby
No reasons on record yet
Open preview
Nearest planning decisions
For: A) Demolition of part of the existing building (29 sqm). B) The construction of an extension to the existing test centre (179 sqm). C). The construction of an extension to the existing garage (271 sqm) and ancillary accommodation for service/garage (202 sqm). D) Reconfiguration of the existing offices area (322sqm, {196sqm, ground floor area and 126sqm first floor area}). E) The construction of a waste water treatment system and all associated site works. A Natura Impact Statement (NIS) is included with this application. Gross floor space of proposed works: 974 sqm. gross floor space of any demolition: 29 sqm
To increase the width of a vehicle test centre previously granted under planning file reference 18/1801
Of a) 2 no. units, (1 x 1235 sqm and 1 x 2060 sqm gross floor area) as constructed, and existing 39 car parking spaces, as amended from 2 no. units (2 x557 sqm, gross floor area) permitted under pl. ref. 70429. b) Planning permission for change of use from storage/warehousing use to a use for confidential shredding and packaging, recycling facility, in the 2 no. units. c) Planning permission for junction revision/upgrade at access to the N84 granted under pl. ref. 70429. d) Planning permission for revisions to the car parking layout permitted under pl. re. 09/1478 to facilitate the access upgrade to service the site. e) Planning permission for connection to existing services including foul water and surface water including new filter strips and infiltration basin storage at the adjoining site. f) Planning permission for decommissioning of existing wastewater treatment system on site and to be replaced with proposed foul pumping station with connection via rinsing main to adjacent foul treatment system. g) Planning permission for the removal of totem signage. The above works include fencing, weighbridge and all other associated site works. Gross floor space of work to be retained: 2181 sqm
For a, the retention permission of 2 no. units (1 x 1235sqm and 1 x 2060sqm gross floor area)as constructed and as amended from 2 no. (2x 557sqm gross floor area) permitted under Pl. Ref. 70429, with existing connection to treatment system, and associated car parking provision of existing 39 spaces. b, planning permission for change of use from manufacturing units to a confidential shredding and packaging recycling facility, in the 2 no. units. c, planning permission for a demarcation of lanes and stop line at the existing and permitted access/egress point onto the N84. d, and planning for all associated works.
For the infilling of 5.9 hectares of land with non-hazardous, fill material such as soils, stone, hard core, clean concrete rubble etc. as well as all associated works and services. This planning application is accompanied by a Natura Impact Statement
The brief summarizes the pattern across all 619 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €49 incl. VAT.
Source match
Matched from public planning record 21170The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Site-specific risk summary
Included in site brief
Source evidence
Included in site brief
Comparable decision set
Included in site brief