Applications tied to the site
Partial coverage2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
8% of nearby decided applications were refused. The site check found 466 decisions within 5 km, 2 exact-site or onsite candidate records, and 38 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matched1 of 2 layers are loaded for Longford County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedNo verified rural-housing citation is loaded for Longford County Council, so this brief makes no current policy claim and relies on decision history.
2 of 4 layers are loaded for Longford County Council and were intersected with the site; flood and built heritage are not loaded and no conclusion is drawn for them.
2 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
38 structured nearby appeal records.
38 matchedNo current-dated citation is loaded for Longford County Council. Historic references extracted from decisions are never presented as current policy.
Open preview
Open preview
The proposed retention of an existing single storey extension to an existing single storey dwelling house as constructed which was previously granted full planning permission under planning reference PL06/279 together with also seeking retention of an existing bay window which services the existing single storey type dwelling house and all ancillary works
The demolition of existing garage, for construction of new single storey extension to rear/side (East) of dwelling for new bay window to rear of dwelling, for new carport to side (South East) of dwelling, for new bay window to front of dwelling, for changes to existing dwelling elevations and all associated site works. Permission for retention is being sought for single storey extension to side/rear (North) of dwelling, for detached garage to East of dwelling, for changes to dwelling elevations and all ancillary site works
To carry out internal refurbishment works, to construct a two-storey extension at the rear of their existing detached two-storey house, to replace the existing windows, to install PV roof panels to the rear, to retain the previously converted attached garage, and to carry out necessary ancillary site works
To demolish previous extensions to the side and rear of an existing storey and a half style dwelling and to construct a front porch and a storey and a half style extension to the rear of same and to carry out necessary site works
The proposed construction of 2 no. single storey semi-detached type dwelling houses, boundary fences/walls, vehicular entrances, connections to the existing water, wastewater and surface water networks and all associated site development works
Proposed bungalow type dwelling house, detached garage, formation of new entrance, wastewater treatment system, polishing filter area and all ancillary site works
The brief summarizes the pattern across all 466 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 21365The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief