Applications tied to the site
Partial coverage21 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
21 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
15% of nearby decided applications were refused. The site check found 2,629 decisions within 5 km, 21 exact-site or onsite candidate records, and 311 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
21 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
21 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
311 structured nearby appeal records.
311 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Permission for retention which will consist of (a) Extension to dwelling house consisting of ground floor living space and mezzanine level den area (b) elevation alterations to dwelling house (c) increasing width of the driveway entrance (d) removing the lawn at the front and replacing with paving and all associated site works and services
Planning permission is sought for the development which will consist of widening the existing vehicle entrance, the demolition of a ground floor side garage and chimney, the replacement of all external windows and doors and minor alterations to the rear façade, the construction of a ground floor side and rear single storey extension and front entrance porch, the construction of a single storey rear garden shed and all associated works
Planning permission for the development which will consist of the demolition of existing flat roof single storey garage to side of house which abuts another building in separate ownership as part of a terrace of buildings and construction of two- storey flat roof extension in its location with external rear access created, demolition of standalone chimney stack and construction of a single storey flat roof extension to rear of property. The development will also consist of provision for a new dormer window at roof level to rear of property, a shed to rear of property, ancillary services and site works including a widening access entrance
Permission for the construction of a rear single & 2 storey extension and for a 2 storey side extension to an existing dwelling, including minor elevation alterations and all associated site works
Permission for development which consists of revised distance from rear boundary to rear building line of new extension as granted under plan refs; 18/442 and 20/116. Retention for installation of new window unit within the existing window ope located on the ground floor north side elevation at the new playroom/study
Permission for development which will consist of change of house extension plans from previously granted plan ref 18/442, including demolition of existing side and rear single storey extensions, demolish existing boiler shed (1m2) and replacement with new one and two storey side and rear extension (82m2), alterations to interior and minor elevation alterations. Development includes all internal alterations, and all services and site layout works
The brief summarizes the pattern across all 2,629 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 21381The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief