Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
7% of nearby decided applications were refused. The site check found 280 decisions within 5 km, 1 exact-site or onsite candidate record, and 14 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
14 structured nearby appeal records.
14 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
For construction of a tourist campsite comprising (a) vehicular access from existing public road; (b) parking area for cars and camper vans; (c) pathways leading to tent, yurt and log cabin grassed camping area; (d) a single storey check in cabin building; (e) a single storey winter storage building for yurts and tents; (f) a single storey building incorporating toilets, showers and laundry facilities; (g) stables and sand arena; (h) all weather pitch & playground area; (I) install waste water treatment system and percolation area; (j) and all other ancillary works. Significant further information and revised plans have been submitted.
To construct a two storey (187m2) extension to the north west facing wing of the existing nursing home building, comprising of 6 no. bedrooms with 6 no. en-suites, together with all associated site works
Of alterations to an existing dwelling (planning ref. no. 05/226). Revisions for which retention is sought include (a) a single-story extension of 30.8 sq m to the side of the dwelling, (b) revised roof plan to the side of the dwelling over the previously approved side extension (planning ref. no. 05/226), and (c) covered area to the side of the existing garage
To (1) retain and complete site entrance (2) retain amendments to elevations of existing domestic garage (3) retain existing retaining stone wall and full planning PERMISSION is sought to construct (1) a two storey extension to rear and one storey extension to west side of existing two storey house (2) to enlarge one storey east side part of existing house (3) to demolish existing porch on the front and place enlarged arch door (4) to decommission existing septic tank and (5) construct proprietary wastewater unit (6) raised walls and roof of one of existing shed in ruin and all ancillary site works
To (a) construct a part two storey/part single storey (with garage underneath) style dwelling, (b) construct partial new boundary (c) install propriety sewage treatment unit and percolation area (d) form new entrance from public road, (e) retain existing agricultural entrance, (f) together with all associated site works
To (a) construct a part two storey/part single storey (with garage underneath) style dwelling, (b) construct partial new boundary (c) install propriety sewage treatment unit and percolation area (d) form new entrance from public road, (e) retain existing agricultural entrance, (f) together with all associated site works. SIGNIFICANT FURTHER INFORMATION HAS BEEN RECEIVED
The brief summarizes the pattern across all 280 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 21477The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief