Free preview / €29 incl. VAT site brief

Site planning risk brief

Fix the brief to an Eircode, a dropped pin or a drawn site boundary. PlanIntel then checks the planning register, available spatial layers, appeals and current indexed policy evidence.
See sample PDF

Define the land to check

Taghadoe , Maynooth , Co. Kildare.Opens secure checkout for the €29 incl. VAT site risk brief. Promotion codes can be entered at checkout.
€29 incl. VAT once-off PDF, no account required
Refund requests are reviewed under the published refund policy
Derived from public planning records and linked source documents
PlanIntelSite risk brief preview

Site planning risk brief

Taghadoe , Maynooth , Co. Kildare.

One-off house / within 5 km where a location match is available

Preview

Local planning pattern

13% of nearby decided applications were refused. The site check found 1,025 decisions within 5 km, 1 exact-site or onsite candidate record, and 91 structured appeals.

Matched source
21579
Project type
One-off house
Coverage
5 km radius

What this site brief can substantiate today

Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.

Applications tied to the site

Partial coverage

1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.

1 matched

Zoning and settlement

Not yet covered

Current indexed zoning and settlement layers are intersected with the selected site where coverage exists.

Rural-housing policy

Not yet covered

Current section-and-page citations have not yet been loaded for this authority.

Flood, heritage, ecology and archaeology

Not yet covered

Each layer reports its own coverage; missing coverage never appears as a clean result.

Access, road and wastewater prompts

Partial coverage

0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.

Structured appeal history

Confirmed coverage

91 structured nearby appeal records.

91 matched

Current policy citations

Not yet covered

Historic extracted references are not presented as current policy; verified citations are still being loaded.

1,025Nearby applications
1Site-linked candidates
13%Nearby refused
91Structured appeals

Top refusal reasons nearby

No reasons on record yet

More refusal reasons are being processed from public planning records.

Nearest planning decisions

21579

(a) Retention permission for change of use of existing farm building to office use with canteen and WC. (b) Planning permission for new recessed vehicular entrance. Existing entrance to be closed up. (c) Planning permission for new 630sqm shed for agricultural use. (d) Planning permission for new proprietary wastewater treatment system and sand filter percolation area. (e) Planning permission for new surface water management works. Revised by Significant Further Information which consists of submission of a Natura Impact Statement

Granted0.0 km03 May 2022
201243

The construction of a single storey bungalow, domestic garage, recessed entrance, secondary effluent treatment system and all associated site works,

Granted0.2 km21 June 2021
17959

Construction of a two storey detached type house, one and a half storey detached type domestic garage with loft store, effluent treatment system, and all ancillary siteworks

Granted0.5 km07 March 2018
2560326

For the construction of a solar PV development and an ‘under the fence’ transformer compound on a ca. 180ha site consisting of: I. Solar PV panels laid out in arrays across the Site; II. 39 No. inverter units (ca. 2.9m (h) x ca. 6.1m (l) and 2.4(w)); III. 1 No. control room structure (5m (h) x 15.3m (l) and 3.7m (w)); IV. 1 No. transformer unit (ca. 6m x ca. 4m) and associated bund; V. Security fencing around the ‘under the fence’ transformer compound (2.65m high); VI. Electrical and communications cabling; VII. Pole-mounted security cameras; VIII. Perimeter security fencing (2m high) and security gates; IX. Upgrade of 3 No. existing Site entrances; X. Development of 2 No. new Site entrances; XI. 3 No. temporary construction compounds; XII. Internal access tracks; and, XIII All associated ancillary development, landscaping and reinstatement works

Refused0.9 km22 May 2025
20795

Increasing the number of children catered for from 10 to 14 in line with Early Childhood Ireland ECCE Scheme

Granted0.9 km06 October 2020
2360228

For (A) permission for 42 no. serviced camp sites, (B) erection of clubhouse building with indoor activity rooms, shop, coffee dock, cleaners store, reception area and staff toilet, (C) erection of 2 no. toilet blocks consisting of Gents and Ladies toilets and family changing areas with wash up area, (D) the installation of a septic tank, integrated constructed wetlands and percolation area (E) Permission is sought for 38 no. car parking spaces with 4 no. E car charging points, 20 covered cycle parking spaces and (F) access to the proposed site is off the existing private roadway granted planning permission under file ref no: 18/403 and all associated site development works. Revised by Significant Further Information which consists of Revised design of the reception building and toilet blocks.

Refused1.0 km23 September 2024

The brief summarizes the pattern across all 1,025 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.

The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.

Exact site history and boundary checks

Site brief

Policy and mapped constraints

Site brief

Appeals and comparable decisions

Site brief

Deterministic risk prompts

Site brief
Ready to get the site risk brief?€29 incl. VAT once-off PDF, no account required