Permission for the construction of a dwelling house, a domestic garage/store together with the installation of a waste water treatment system / percolation area and all necessary site services / ancillary siteworks at
Site planning risk brief
Search a place or planning reference, choose the development type, then preview the report before getting the full site brief.Site planning risk brief
Liswilliam , Dysart , Roscommon
One-off house / within 5 km where a location match is available
Executive snapshot
Local planning pattern
8% of nearby decided applications were refused. The preview found 73 nearby planning records within 5 km where a location match is available.
- Matched source
- 21582
- Project type
- One-off house
- Coverage
- 5 km radius
Open preview
Top refusal reasons nearby
No reasons on record yet
Open preview
Nearest planning decisions
Permission for the construction of a dwelling house, a domestic garage/store together with the installation of a waste water treatment system/percolation area and all necessary site services/ancillary siteworks at
Permission for the construction of a dwelling house, a domestic garage / store together with the installation of a waste water treatment system / percolation area and all necessary site services / ancillary siteworks at
For the erection of dwelling house with sewerage treatment plant and percolation area at
Permission to construct a five bay double slatted sheep shed on lands at
Planning permission to construct a fully services private dwelling house with waste water treatment system and garage/fuel shed to include all associated site works at
The brief summarizes the pattern across all 73 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €49 incl. VAT.
Source match
Matched from public planning record 21582The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Site-specific risk summary
Included in site brief
Source evidence
Included in site brief
Comparable decision set
Included in site brief