Applications tied to the site
Partial coverage4 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
4 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
2% of nearby decided applications were refused. The site check found 65 decisions within 5 km, 4 exact-site or onsite candidate records, and 1 structured appeal.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
4 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
4 matched1 of 2 layers are loaded for Sligo County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedNo verified rural-housing citation is loaded for Sligo County Council, so this brief makes no current policy claim and relies on decision history.
2 of 4 layers are loaded for Sligo County Council and were intersected with the site; flood and built heritage are not loaded and no conclusion is drawn for them.
2 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
1 structured nearby appeal record.
1 matchedNo current-dated citation is loaded for Sligo County Council. Historic references extracted from decisions are never presented as current policy.
Open preview
Open preview
Development consisting of the retention of the following; (1) the removal of the trees, hedgerow, mesh fencing, landscaping including kerbing to the west side of the school; (2) provision of a new one way system/drop-off area with access from and egress onto the L68043, provision of carparking along the L68043; (3) connections to existing surface water drainage and all associated site works
Development consisting of the construction of a new car park and set down area, front boundary wall, formation of a new site entrance and exit with associated barriers, site boundary walling and fencing, car park lighting and all associated site works
Development consisting of the construction of a new single storey extension to the rear of existing dwelling house and all associated site works
Development consisting of construction of a single storey extension to an existing dwelling house and all associated site works and services.
(1) a new single-story extension to the front and side and rear of our existing dwelling house (2) modifications to the existing elevations to include alterations to the existing windows, infill of the existing covered porch to create a new entrance, new Velux roof lights and alterations to the existing garage door to create a new window opening, (3) and all associated site works
Development consisting of the following: (1) to retain concrete bases and complete 4 no. houses (two blocks of 2 semi-detached 4 bedroom two-storey houses) and (2) permission to construct 26 no. houses consisting of 12 no. 4 bedroom two-storey semi-detached houses, 12 no. 3 bedroom two-storey semi-detached houses, 2 no. 2 bedroom two-storey semi-detached houses and (3) construct new road with services and connect to existing road and services in the Forthaven Housing Development (previous grant of planning permission PL 04/503 refers), and including all ancillary site development works
The brief summarizes the pattern across all 65 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 2184The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief