Applications tied to the site
Partial coverage2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
14% of nearby decided applications were refused. The site check found 260 decisions within 5 km, 2 exact-site or onsite candidate records, and 5 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
5 structured nearby appeal records.
5 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
To construct a single storey dwelling and garage. The application will also include an effluent treatement unit, percolation area, revisions to existing entrance and all associated site works and drainage.
Construct a four bedroom dwelling with garage. The application will also include an effluent treatment unit, percolation area, revised entrance, and all associated site works and drainage.
Construction of a three-bedroom dwelling with garage. The application will also include an effluent treatment unit, percolation area, new entrance, and all associated site works and drainage.
To construct a dwelling house and single dwelling treatment system with percolation area and associated site works
A 525 square meter mechanical workshop & bus storage facility, wash-down and waste storage area, and all other associated site works, landscaping, and drainage
Construction of a three-bedroom dwelling with garage, including an effluent treatment unit, percolation area, new entrance, and all associated site works and drainage
The brief summarizes the pattern across all 260 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 22133The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief