Executive snapshot
17% of nearby decided applications were refused. The site check found 212 decisions within 5 km, 2 exact-site or onsite candidate records, and 18 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
2 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
2 matched18 structured nearby appeal records.
18 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
For proposed works to include a solar and storage park on an area of approximately 68.8 hectares, comprising linear arrays of solar photovoltaic panels mounted on steel supported structures with associated cabling and ducting (including cable connection to the proposed onsite 110 kV tail fed substation), 50 inverter substations, a storage park (including 30 no. containers with battery cells, transformers and power conversion units), perimeter fencing, 8 no. palisade double security gates, 3 no. temporary construction compound/material storage areas, 6 no. steel storage containers, 17 no. turning bays, CCTV, a temporary construction stage wheel wash system and all associated ancillary development works. Elgin Energy Services Ltd. are applying for the proposed development to have planning permission that is effective for 10 years (and an operational period of 40 years). A Natura Impact Statement (NIS) has been prepared and will be submitted to the planning Authority with the Planning Application.
For proposed works which will include a solar farm on an area of approximately 27.0 hectares, comprising photovoltaic panels on ground mounted frames, 1 No., onsite 38kV substation, an energy storage system (4 No. units), 10 No. single storey inverter/transformer stations, security fencing, a palisade double security gate, 2 No. storage containers, CCTV, a temporary construction stage wheelwash system and all ancillary development works. Elgin Energy Services Ltd are applying for the proposed solar farm to have planning permission that is effective for 10 years (and an operational period of 35 years). The planning application incudes a Natura Impact Statement
Permission for a development to include a solar farm on an area of approximately 17.6 hectares, comprising photovoltaic panels on ground mounted frames, 1 no. onsite 38kV substation, 10 no. single storey inverter/transformer stations, security fencing, a palisade double security gate, 2 no. storage containers, CCTV, a temporary construction stage wheel wash system and all associated ancillary development works. Elgin Energy Services Ltd. are applying for the proposed solar farm to have planning permission that is effective for 10 years (an an operational period of 40 years). A Natura Impact Statement (NIS) has been prepared and will be submitted to the planning authority with the planning application
To construct a part single storey, part two storey dwelling, detached single storey double garage, new entrance off existing laneway, bored well, waste water treatment system, percolation area and all associated site works
10 Year permission for development consisting of the construction of a Solar PV development comprising photovoltaic panels laid out in arrays over a total development site area will be ca. 65.6 ha, the construction of a 38kV substation (ca 114.4m2 x 4.75 tall) a transformer unit (ca. 18m2 x 4m tall) and associated bund (ca. 55m2), along with ancillary development including; 24 no. Power Hubs (ca. 15.25m2 x 2.4m) which incorporate an inverter and a transformer, 1 no. single storey communications building (11.1m2 x 2.5m), 1 no. single storey client side sub-station building (15.25m2 x 2.9m), 1 no. single storey equipment storage building (7.5m2 x 2.7m), 10 no. CCTV cameras mounted on 4m high poles, perimeter security fencing, site access, site egress and all ancillary works. Permission currently exists for a PV development on part of the site (Planning Permission Ref No. 16325). An Natura Impact Statement will accompany the planning application.
Permission to retain conservatory as constructed to the side of existing dwelling house, all ancillary site works and services.
The brief summarizes the pattern across all 212 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 22149The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief