Applications tied to the site
Partial coverage2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
6% of nearby decided applications were refused. The site check found 579 decisions within 5 km, 2 exact-site or onsite candidate records, and 27 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
27 structured nearby appeal records.
27 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Permission for development consisting of 1) Two storey extension to the existing facility via provision of additional storage incorporating a Dispatch area, Chill area and loading area at Ground Floor level. Ancillary office, staff facilities and storage areas at First Floor level. 2) An additional storage facility adjacent to the proposed extension for use as a mushroom corridor. 3) Demolition and removal of 3 No. Storage sheds to incorporate additional yard space. 4) The retention of 3 No. Portable cabins to the front of the site on a 3 year basis. 5) Retention of additional carparking area on site. 6) Additional landscaping, signage and boundary treatments. 7) The construction of an ESB substation to the rear of the development. 8) The upgrade of existing entrances. 9) Provision of the Pv Panels on proposed extension. 10) All ancillary site development/construction works to facilitate connection to existing foul water, storm water and services. Significant further information received in relation to the submission of a noise survey and revision of site location and site layout map
Permission for development consisting of the installation of ground mounted photovoltaic panels for electricity generation to service the existing adjoining mushroom production facility including all associated site works
Permission consisting of conversion of existing domestic garage into dependant relative accommodation and retain sewerage treatment unit and all associated site works.
Permission for the development consist of the following items: 1. Demolish existing small domestic storage shed to rear of existing bungalow dwelling house 2. To construct a single storey extension to rear of existing bungalow dwelling house. 3. To construct a small domestic storage shed to rear of existing bungalow type dwelling house
Permission for the installation of ground mounted photovoltaic panels for electricity generation to service the existing adjoining mushroom production facility including all associated site works
Permission for a development consisting of the demolition of three agricultural sheds and two agricultural silos and the erection of a detached two storey dwelling with single storey elements, detached domestic garage, new site access on the public road with entrance gates and piers, access lane, waste water treatment plant with percolation area and all associated site works
The brief summarizes the pattern across all 579 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 22203The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief