Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
4% of nearby decided applications were refused. The site check found 130 decisions within 5 km, 1 exact-site or onsite candidate record, and 2 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matched1 of 2 layers are loaded for Sligo County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedNo verified rural-housing citation is loaded for Sligo County Council, so this brief makes no current policy claim and relies on decision history.
2 of 4 layers are loaded for Sligo County Council and were intersected with the site; flood and built heritage are not loaded and no conclusion is drawn for them.
2 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
2 structured nearby appeal records.
2 matchedNo current-dated citation is loaded for Sligo County Council. Historic references extracted from decisions are never presented as current policy.
Open preview
Open preview
Development consisting of the following: To construct a single storey type domestic dwelling, a new site entrance, a domestic garage, construct a domestic waste water treatment system to EPA code of practice standards together with all associated ancillary works
Development consisting of the construction of a single storey type domestic dwelling, a new site entrance, construct a domestic waste water treatment system to EPA code of practice standards together with all associated ancillary works
1. To construct a agriculture fodder storage shed and all ancillary works
Development consisting of the construction of a single storey type domestic dwelling, domestic garage, a new site entrance, construct a domestic waste water treatment system to EPA code of practice standards together with all associated ancillary works
Development consisting of the construction of a two storey type domestic house, domestic garage, demolition of an existing derelict building, construction of a domestic waste water treatment system to current EPA code of practice standards together with all associated ancillary works.
Demolish existing porch and extend existing 50M2 house by 90M2
The brief summarizes the pattern across all 130 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 22431The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief