Free preview / €49 incl. VAT site brief

Site planning risk brief

Search a place or planning reference, choose the development type, then preview the report before getting the full site brief.
See sample PDF
Opens secure checkout for the €49 incl. VAT site risk brief.Have a code? Enter it at checkout.
€49 incl. VAT once-off PDF, no account required
Refund requests are reviewed under the published refund policy
Derived from public planning records and linked source documents
PlanIntelSite risk brief preview

Site planning risk brief

BALLYKILLEEN SHEAN KILCUMBER AND BALLINOWLART NORTH , CO. OFFALY

One-off house / within 5 km where a location match is available

Preview

Local planning pattern

13% of nearby decided applications were refused. The preview found 137 nearby planning records within 5 km where a location match is available.

Matched source
22494
Project type
One-off house
Coverage
5 km radius
137Nearby applications
13%Refused
119Conditional grants
0Refusal reasons

Top refusal reasons nearby

No reasons on record yet

More refusal reasons are being processed from public planning records.

Nearest planning decisions

22494

THE DEVELOPMENT OF (A) APPROXIMATELY 970M OF NEW INTERNAL ACCESS ROADS FOR THE PERMITTED CUSHALING WIND FARM (PLANNING REF. PL2/ 19/606 AND ABP 306924-20), (B) UPGRADE OF APPROXIMATELY 560M OF AN EXISTING BORD NA MONÁ BOG ACCESS ROAD, (C) CONSTRUCTION OF A 1.6KM DOUBLE CIRCUIT 33KV UNDERGROUND COLLECTOR CABLE FROM THE PERMITTED CUSHALING WIND FARM TO THE PERMITTED WIND FARM SUBSTATION, (D) DEMOLITION AND REPLACEMENT OF A BORD NA MONÁ BOGLAND ACCESS BRIDGE AND (E) RELOCATION OF THE PERMITTED CUSHALING WIND FARM SUBSTATION 25 METERS SOUTHWEST. A NATURA IMPACT STATEMENT (NIS) WILL BE SUBMITTED TO THE PLANNING AUTHORITY WITH THE APPLICATION

Granted0.0 km28 March 2023
19500

THE ERECTION AND OPERATION OF A MULTI-USER TELECOMMUNICATIONS MAST TO BE UTILISED AS PART OF THE NATIONAL BROADBAND PLAN, COMPRISING A 45-METRE LATTICE STRUCTURE, 6NO. CABINETS ON STRUCTURE PLINTHS, FIBRE CHAMBER, ANTENNAE, TURNING AREA, COMPOUND, FENCING, GATE, ACCESS AND ALL ASSOCIATED WORKS AND SERVICES

Granted0.2 km18 December 2019
21291

DEVELOPMENT AT EDENDERRY POWER PLANT. EDENDERRY POWER LIMITED CURRENTLY HAS PLANNING PERMISSION TO OPERATE EDENDERRY POWER PLANT AS A PEAT AND BIOMASS CO-FIRED POWER PLANT UNDER GRANT OF PLANNING PERMISSION (OFFALY COUNTY COUNCIL REGISTER REFERENCE - PL2/15/129, AN BORD PLEANÁLA REGISTER REFERENCE - PL 19.245295). THE PROPOSED DEVELOPMENT WILL CONSIST OF THE CONTINUED OPERATION OF EDENDERRY POWER PLANT FROM THE BEGINNING OF 2024 TO THE END OF 2030 EXCLUSIVELY USING SUSTAINABLE BIOMASS FUEL. THE APPLICANT PROPOSES TO INCREASE THE VOLUME OF BIOMASS CONSUMED AT THE FACILITY FROM A CURRENT MAXIMUM OF 300,000 TO 530,000 TONNES PER ANNUM. IT IS PROPOSED TO UTILISE THE EXISTING PERMITTED ELECTRICITY GENERATION STATION AND INFRASTRUCTURE, INCLUDING FUEL HANDLING SYSTEMS, UTILITIES, PROCESSING SYSTEMS AND ANCILLARY STRUCTURES AS PART OF THE PROPOSED DEVELOPMENT. THERE WILL BE NO CHANGE TO EXISTING INFRASTRUCTURE PRESENT ON-SITE. SITE ACCESS AND EGRESS WILL USE THE EXISTING PERMITTED SITE ENTRANCES TO THE R401 PUBLIC ROAD. THERE WILL BE NO CHANGE TO THE PERMITTED BOUNDARY OF THE FACILITY. EDENDERRY POWER PLANT IS LICENCED BY THE ENVIRONMENTAL PROTECTION AGENCY UNDER AN INDUSTRIAL EMISSIONS (IE) LICENCE [REF. P0482-04]. ACTIVITIES AT THE FACILITY AND ASSOCIATED ENVIRONMENTAL ASPECTS AND EMISSIONS WILL CONTINUE TO BE REGULATED AND CONTROLLED BY THE EPA. THE PLANNING APPLICATION IS ACCOMPANIED BY AN ENVIRONMENTAL IMPACT ASSESSMENT REPORT (EIAR). THE PLANNING APPLICATION IS ALSO ACCOMPANIED BY A NATURA IMPACT STATEMENT (NIS)

Granted0.3 km25 March 2022
19496

ALTERATIONS TO THE EXISTING 110KV CUSHALING SUBSTATION AND INCLUDES THE INSTALLATION OF 110KV AIS SWITCHGEAR WITH ASSOCIATED FOUNDATIONS, STEELWORK, SUPPORTS AND CONNECTORS AND ASSOCIATED WORKS

Granted0.6 km17 December 2019
2582

LEVELLING OF AGRICULTURAL LANDS BY THE IMPORTATION OF CLEAN, UNCONTAMINATED SOIL AND STONE MATERIALS UNDER ARTICLE 27 OF THE EUROPEAN COMMUNITIES (WASTE DIRECTIVE) REGULATIONS 2011, AS AMENDED. AN ARTICLE 6(3) OF THE HABITATS DIRECTIVE SCREENING FOR APPROPRIATE ASSESSMENT REPORT HAS BEEN PREPARED IN RESPECT OF THE PROPOSED DEVELOPMENT

Granted0.6 km27 April 2026
2560654

New site entrance arrangements, replacing the previously consented access points 3 and 4 approved under Planning Reference 21/598, together with associated internal access tracks, drainage systems and all related works

Granted0.6 km08 April 2026

The brief summarizes the pattern across all 137 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €49 incl. VAT.

The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.

Site-specific risk summary

Site brief

Source evidence

Site brief

Comparable decision set

Site brief

Next-step checklist

Site brief
Ready to get the site risk brief?€49 incl. VAT once-off PDF, no account required