Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
8% of nearby decided applications were refused. The site check found 222 decisions within 5 km, 1 exact-site or onsite candidate record, and 3 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matched1 of 2 layers are loaded for Monaghan County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedNo verified rural-housing citation is loaded for Monaghan County Council, so this brief makes no current policy claim and relies on decision history.
2 of 4 layers are loaded for Monaghan County Council and were intersected with the site; flood and built heritage are not loaded and no conclusion is drawn for them.
2 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
3 structured nearby appeal records.
3 matchedNo current-dated citation is loaded for Monaghan County Council. Historic references extracted from decisions are never presented as current policy.
Open preview
Open preview
Permission for a proposed development consisting of the construction of a 2-bay fire station (including a training tower) and ancillary accommodation and site works. The site works include a vehicular access from R162, pedestrian access from eastern laneway, large hardstanding area for training and turning circles, 10 number carparking spaces including disabled spaces(s), fuel tanks and gas tanks, all service connections and boundary treatments at the site
Retain and complete dormer extension to side of existing single storey residence, retaining wall to side and rear, alterations and additions to elevations and all associated site works. Significant further information includes revisions to dwelling and waste water treatment system.
Permission to retain as constructed domestic shed & attached fuel store to the rear
Permission for 1. Retention permission for first floor apartment previously permitted as storage for shop under planning reference no. 07/2345 and 2. Permission for the creation of a vehicular entrance to the rear of the site together with all ancillary site development works. Significant Further Information relates to retention permission for a first floor apartment over existing ground floor shop unit.
Permission for material alterations to include: 1. Raising wall-pate level by 1100mm to accommodate a new slated pitched roof with 4no. Dormer Windows to front elevation 2. New Gable wall to front elevation incorporating a new window 3. New 32m2 single-storey extension to east (side) elevation with slated pitched roof 4. All associated works
Construct two storey extension to the front and side of existing building, to include new science laboratory, shared preparation area, access link, staircase, 2 classrooms at lower level, alterations to existing science laboratory & associated site works
The brief summarizes the pattern across all 222 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 228002The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief