Applications tied to the site
Partial coverage6 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
6 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
6% of nearby decided applications were refused. The site check found 540 decisions within 5 km, 6 exact-site or onsite candidate records, and 21 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
6 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
6 matched1 of 2 layers are loaded for Monaghan County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedNo verified rural-housing citation is loaded for Monaghan County Council, so this brief makes no current policy claim and relies on decision history.
2 of 4 layers are loaded for Monaghan County Council and were intersected with the site; flood and built heritage are not loaded and no conclusion is drawn for them.
2 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
21 structured nearby appeal records.
21 matchedNo current-dated citation is loaded for Monaghan County Council. Historic references extracted from decisions are never presented as current policy.
Open preview
Open preview
Permission for a development consisting of the demolition of the building known as Ballinode Community Hall and partial demolition of workshop buildings to the south and the east of the community hall building, the construction of a two storey over basement office building with training facilities, the provision of carparking and hard surfaced areas around the building and all associated site works, Significant Further information relates to, Draft Waste Water Management plan, Road Safety Audit, Fuel Interceptor details
Permission for a development consisting of the partial demolition of the building known as Ballinode community hall and the rebuilding of the demolished areas using block work walls with a plastered finish, the replacement of the existing roof structure and finish with the profiled sheeting which is grey in colour, alterations to the internal layout and a change of use to office accommodation from its current use as a community hall, and all ancillary site works.
Permission for the construction of an ESB substation building, a roadway to the unit, the laying of all services and all associated site works
Permission for development consisting of a revision to house plans and site plans from those previously granted under planning application reference number 21/372, relating to the construction of a single storey dwelling house and all associated site works
Change of house plans from those previously granted under planning application reference numbers 15/134 and 20/9005, relating to the construction of a dormer style dwellinghouse development and all associated site works.
Construct a dormer type dwelling, domestic garage, new entrance on to public road, connection to public mains foul sewer, complete with all ancillary site works, previously granted under Planning Refs: 05/708 & 05/1177
The brief summarizes the pattern across all 540 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 23212The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief