Applications tied to the site
Partial coverage9 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
9 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
9% of nearby decided applications were refused. The site check found 681 decisions within 5 km, 9 exact-site or onsite candidate records, and 48 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
9 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
9 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
48 structured nearby appeal records.
48 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
CONSTRUCTION OF A THREE STOREY WAREHOUSE DISTRIBUTION CENTRE CONSISTING OF A WAREHOUSE, ASSOCIATED OFFICES, SIGNAGE, CAR AND HGV PARKING SPACES. PERMISSION IS ALSO SOUGHT FOR THE CONSTRUCTION OF NO.2 NEW SITE ENTRANCES, CONNECTING TO SERVICES AND ALL ASSOCIATED SITE WORKS
CONSTRUCTION OF A SINGLE STOREY DISTRIBUTION WAREHOUSE BUILDING WHICH SHALL CONSIST OF A GROUND FLOOR WAREHOUSE AND OFFICES AT AXIS BUSINESS PARK, TULLAMORE, CO. OFFALY. THE DEVELOPMENT WILL ALSO CONSIST OF A NEW SITE ENTRANCE AND ACCESS ROAD, FOOTPATHS, CAR AND HGV PARKING SPACES, SERVICE YARD, LOADING AND UNLOADING BAY, COVERED CYCLE RACK, BIN STORAGE AND BOUNDARY FENCE WITH ALL ASSOCIATED SITE WORKS AND SERVICES
NEW INDUSTRIAL/WAREHOUSE BUILDING WITH ASSOCIATED OFFICE ACCOMMODATION, CAR-PARKING WITH ALL ANCILLARY SITE WORKS
CONSTRUCTION OF A SINGLE STOREY WAREHOUSE DISTRIBUTION CENTRE CONSISTING OF A WAREHOUSE, ASSOCIATED OFFICES, SIGNAGE, CAR AND HGV PARKING SPACES, SECURE EXTERNAL LOADING AND UNLOADING AREA, AND ALL ASSOCIATED SITE WORKS AND SERVICES INCLUDING THE CONSTRUCTION OF A NEW SITE ENTRANCE AND SITE ACCESS ROAD
A SINGLE BLOCK COMPRISING 6 UNITS OF RETAIL/COMMERCIAL/INDUSTRIAL WAREHOUSE AND ASSOCIATED OFFICE SPACE, CONNECTION TO EXISTING WATER AND SEWER SERVICES, A SECOND SITE ENTRANCE ONTRO L20072 ACCESS ROAD AND ALL ASSOCIATED SITE DEVELOPMENT WORKS
CHANGE OF USE FROM INDUSTRIAL / WAREHOUSE TO A TRAINING FACILITY, EXTENDING THE MIDLANDS TRAINING CENTRE INTO THE ADJOINING UNIT 23E. THE DEVELOPMENT WILL PROVIDE A NEW ELECTRICAL APPRENTICE TRAINING AREA AND STORAGE SPACE. THE WORKS WILL ALSO INCLUDE INTERNAL ALTERATIONS AND A NEW MEZZANINE WITH ALL ANCILLARY WORKS
The brief summarizes the pattern across all 681 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 2329The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief