Applications tied to the site
Partial coverage5 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
5 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
6% of nearby decided applications were refused. The site check found 545 decisions within 5 km, 5 exact-site or onsite candidate records, and 22 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
5 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
5 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
22 structured nearby appeal records.
22 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Permission to erect a new 2 story office building, new access from service road, connection to existing public services, car parking, signage and all associated ancillary works
Permission to construct new 2 storey Office Building, new access from service road, connection to existing public services, car parking, signage and all associated ancillary works.
Permission for development consisting of a new advanced technology unit comprising two storeys of office accommodation and a production space, together with associated car parking, yard, landscaping, ancillary signage and site development works.
Permission for a development consisting of the construction of a three storey office/workspace building incorporating self-contained lettable ground floor office space/workspace units, toilet accommodation, kitchenette, accessible WC/shower, storage areas, circulation area, lift, staircases and plant. First and second floor is a self contained open plan office space, cellular offices, reception/waiting area, meeting rooms, training room, toilet accommodation, kitchenettes, accessible WC/shower, storage areas, circulation area, lift and staircases. External works include car parking area, pedestrian pathways, cycle stands, electric vehicle charging point, enclosed service yard, associated landscape and connections to all existing services
Permission for a development consisting of a two storey extension to the existing M:TEK building, incorporating lettable office accommodation including co-working space. External works will include connections to existing services, alterations to existing carparking area, footpaths and associated landscaping.
Outline Permission to erect a new advanced technology building together with new access from service road, connection to existing public services, car parking, signage and all associated ancillary works
The brief summarizes the pattern across all 545 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 2360119The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief