Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
3% of nearby decided applications were refused. The site check found 228 decisions within 5 km, 1 exact-site or onsite candidate record, and 6 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matched1 of 2 layers are loaded for Laois County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedNo verified rural-housing citation is loaded for Laois County Council, so this brief makes no current policy claim and relies on decision history.
2 of 4 layers are loaded for Laois County Council and were intersected with the site; flood and built heritage are not loaded and no conclusion is drawn for them.
2 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
6 structured nearby appeal records.
6 matchedNo current-dated citation is loaded for Laois County Council. Historic references extracted from decisions are never presented as current policy.
Open preview
Open preview
A). demolish existing two storey dwelling. b). reconfigure and increase existing car-parking on site and incorporate coach parking bays, c). develop pedestrian lighting in carpark and along footpaths, d). replace existing carpark entrance with dual entrances, e). improve footpaths and landscaping, f). change existing fencing and boundary treatments and all ancillary site and other works
Develop a)new all weather multi-sport pitch to include sports lighting, b) new running/walking track to include solar lighting, c) upgrade of the existing hurling/multi-sport grass pitch to include sports lighting, d) relocation and rearrangement of the basketball courts to include appropriate sports lighting, e) construction of 3 no. handball/racket ball courts and a skills wall, f) proposed canopy over existing recreation area, g) construction of a new tensile structure, h) 3 no. table tennis tables and 4 no. skittles alleys, I) construction of new obstacle course, pathways, landscaping and all ancillary site and other works
Retain first floor and ground floor extension to rear of existing dwelling house and all associated site works
Erect (1) temporary portocabin type building, (2) temporary new post and rail mesh type front fence, (3) temporary parking area
Retain 1) Retention permission to previously granted planning permission ref no 2460121 to included 2) Retention of as-built reduced floor area to Building A. 3) Retention of lower eaves and ridge height to Building A. 4) Retention of as-built openings to Building A. 4) All associated site works.
Construct two, two storey, apartment blocks. Block 1 will consist of 4 one-bedroom apartments, stairwell and lift shaft. Block 2 will consist of 3 one-bedroom apartments, a communal/office staff area, bin bay, cycle shelter, parking and all associated site works
The brief summarizes the pattern across all 228 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 2360190The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief