Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
10% of nearby decided applications were refused. The site check found 230 decisions within 5 km, 1 exact-site or onsite candidate record, and 13 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
13 structured nearby appeal records.
13 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
To remove an attached shed and derelict shed and to construct a Family Flat extension to the side and for the indefinite retention of a porch to the front of the existing dwelling house, a proposed new packaged wastewater treatment system and infiltration area
To construct a two storey dwelling, detached garage, proprietary wastewater treatment plant and all associated site works at
For renovation of existing outbuilding into artist's studio and replacement building for 2 no. public toilets to include all site and ancillary works
A 10 year planning permission - The development will consist of permission for a Solar PV Energy Development with associated Battery Storage Compound with a total site area of c.103.64ha, to include solar panels mounted on steel support structures, associated cabling and ducting, inverters, transformers, switchgear substations, auxiliary transformer, permanent storage container, monitoring houses, composting toilet, BESS customer substation, battery blocks, BESS inverters, BESS interface cabinets, BESS MV skids, temporary construction compounds, tracks, boundary security fencing and security gates, CCTV, landscaping and ancillary works, with a 40year operational period. It is proposed that the Proposed Development will be accessed from three separate access points off; Site Access 1 will be a newly created access point of the L4205 and Site Access 2 and 3 will utilise two existing access points of an unnamed local road which runs along the northern boundary of the Application Site, both Site Access 2 and 3 will require upgrading. A Natura Impact Statement (NIS) has been submitted to the Planning Authority with the Application
For construction of a new single storey private dwelling, associated treatment system along with all site and ancillary works
For construction of a new single storey private dwelling, associated treatment system, closure of existing site entrance and construction of new site entrance along with all other site and ancillary works
The brief summarizes the pattern across all 230 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 2360242The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief