Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
11% of nearby decided applications were refused. The site check found 44 decisions within 5 km, 1 exact-site or onsite candidate record, and 3 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
3 structured nearby appeal records.
3 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Planning permission for the development of a Battery Energy Storage System (BESS) designed to provide system support services to the Electricity Grid consisting of: (i) the installation of 56 No. battery containers and medium voltage power stations (MVPS) (ii) construction of a new single-storey IPP building, (iii) new internal access roads, drainage, civil engineering works, landscaping, lighting, car parking, security fencing and all associated site work at
Retention permission for the following: 1. To retain two number agriculture sheds and all ancillary works at
The development will consist of proposed works to existing private mooring on the shoreline of Lough Allen comprising of 1) Extension of the existing Southern breakwater; 2) Construction of new breakwater to the north of the existing breakwater complete with floating jetty and ramp; 3) Deepening of the existing boating channel at
For the demolition of an existing detached shed and the construction of a detached shed and the construction of a detached garage and utility room/store to the rear of dwelling in the townland of
Permission to construct single storey dwelling house, provide mechanical effluent treatment unit and percolation area, provide new site entrance and access road including all ancillary site works necessary to complete the development at
Permission to construct 1.new dwelling house, 2.new domestic garage, 3.new entrance onto the public road and 4.to connect to new waste water treatment system together with all associated site works at
The brief summarizes the pattern across all 44 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 2360265The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief