Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
10% of nearby decided applications were refused. The site check found 87 decisions within 5 km, 1 exact-site or onsite candidate record, and 2 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
2 structured nearby appeal records.
2 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Extension to my existing dwelling house at the side to include converting & joining the existing garage with a new roof, bedroom, bathroom, utility, hall, hot press and wardrobe with all ancillary site works
To erect a single storey/storey and half style house as replacement for existing derelict house on site, the application will also include a domestic garage, installation of a proprietary waste water treatment system with percolation area to EPA specifications and all necessary associated site works
1. Construction of 8 number light posts 24-meter-high (achieving 500 lux) on the existing playing pitch. 2. Construction of the proposed (146.5m x 58.3m) Training playing Pitch with 8 number light posts 20-meter-high (achieving 300 lux) to the South west of the site. 3. Construction of the proposed (60m x 40m) Astro Turf Pitch with 4 number light posts 12- meter-high (achieving 300 lux) to the east of the site. 4. Construction of the proposed 25m x 9.6m Viewing Stand including a storeroom to the northwest of the site. 5. Construction of (5m high x 20m in length) Hurling wall located on the South-East side on site. 6. Construction of 3m wide walkways (360m length) to be constructed around the Proposed training and astro turf pitches 7. Proposed carpark consisting 69 No carparking spaces to be finished with tarmac finish and all associated ancillary site works
Change house plans from those that were previously granted for file ref:19/6012 to construct an extension to the rear of our existing house to include an entrance hall, Kitchen, dining, Living area, playroom, pantry, utility, H.P., bathroom, corridor and four bedrooms and to replace the flat roof with a pitch roof and to demolish existing porch and two sheds and to construct a porch and to decommission existing septic tank and to install a new treatment system with percolation area with all ancillary site works
Construction of a dwelling house with treatment system & percolation area and to demolish existing shed with all ancillary site works
Construction of an extension to the rear of existing house to include entrance hall, kitchen, dining and living area, utility, H.P., bathroom, corridor and three bedrooms, one with en-suite and a walk in wardrobe, replace the flat roof with a pitch roof, demolish existing porch and shed, construct a porch, decommission existing septic tank and install a new treatment system with percolation area with all ancillary site works
The brief summarizes the pattern across all 87 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 2360335The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief