Applications tied to the site
Partial coverage10 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
10 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
5% of nearby decided applications were refused. The site check found 907 decisions within 5 km, 10 exact-site or onsite candidate records, and 51 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
10 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
10 matched1 of 2 layers are loaded for Sligo County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedNo verified rural-housing citation is loaded for Sligo County Council, so this brief makes no current policy claim and relies on decision history.
2 of 4 layers are loaded for Sligo County Council and were intersected with the site; flood and built heritage are not loaded and no conclusion is drawn for them.
2 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
51 structured nearby appeal records.
51 matchedNo current-dated citation is loaded for Sligo County Council. Historic references extracted from decisions are never presented as current policy.
Open preview
Open preview
Development consisting of carrying out external works on a protected structure for the removal of 2 no. ATM's, to be infilled with glazing to match the existing. The removal of the night safe front plate, replacing with a blank steel plate, as well as the removal of the Ulster Bank raised lettering shop sign, general bus stop signs and the removal of the Ulster Bank general blue signage on Stephen St and Markievicz Rd. Carry out internal works for the removal of the ATM's in stud walls, as well as the removal of loose furniture and the removal of Ulster Bank signage and merchandise on all floors
Development consisting of: the demolition of an existing derelict two-storey structure fronting Holborn Street; the construction of an extension and associated works to the existing residential building at 7–8 Markievicz Road to provide two additional one-bedroom apartments, fully served by the existing access, stair core and lift; the provision of ancillary ground-floor bicycle storage, refuse storage and plant accommodation accessed from Holborn Street for the benefit of the existing and proposed residential units; the provision of a roof terrace and an external access ladder to facilitate safe access to the existing roof of 7–8 Markievicz Road for plant and water tank maintenance; and all associated site works, services, drainage and ancillary works
Proposed Internal Alterations to existing apartment No. 5 including stairs access to new roof level extension circa. 31m2 including all service connections and associated site works
Development consisting of retention of shopfront alterations that differ from the original planning application granted under PL16/239
Change of use of existing commercial units to revert back to residential
Development consisting of the following: 1. Change of use of existing basement/ground floor apartment to Dental Office, 2. New signage to ground floor
The brief summarizes the pattern across all 907 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 2364The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief