Executive snapshot
6% of nearby decided applications were refused. The site check found 567 decisions within 5 km, 2 exact-site or onsite candidate records, and 26 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
26 structured nearby appeal records.
26 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Planning for a development which will consist of retaining existing access to existing dormer dwelling and all associated site works
Permission to retain as built domestic garage, existing septic tank and soakaway and exit on to public road and all associated works
Permission to demolish existing rear two-storey accommodation (20m2). Construct two-storey extension (126m2) to rear (North). General refurbishment and thermal upgrading of existing dwelling including repairs as required, associated works, conservation, landscaping and ancillary works
Permission for a mono-pitched extension to the north side of the existing food production facility, creating a new food production area at ground floor level and storage at mezzanine level, together with all associated site works
Permission consisting of three extensions to the existing factory, the extensions will comprise a new 2 storey office block and staff amenity area to the south side and a freezer room and dispatch area to the west. Significant Further Information relates to site entrance
Permission to construct an ESB high voltage substation
The brief summarizes the pattern across all 567 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 24121The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief