Applications tied to the site
Partial coverage2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
19% of nearby decided applications were refused. The site check found 405 decisions within 5 km, 2 exact-site or onsite candidate records, and 36 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matched1 of 2 layers are loaded for Kildare County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedOne current citation from the Kildare County Council development plan, with section, page and source URL.
1 matched2 of 4 layers are loaded for Kildare County Council and were intersected with the site; flood and built heritage are not loaded and no conclusion is drawn for them.
2 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
36 structured nearby appeal records.
36 matchedCitations are current-dated and carry policy name, section, page and source URL from the Kildare County Council development plan.
1 matchedOpen preview
Open preview
For construction of a regional distribution warehouse/logistics centre. The proposed main building will have a gross floor area of 3238 sq.m and will have an overall height of 12.8m (from finished floor level to parapet level) with two storey ancillary offices, staff facilities and drivers waiting area located within the main building envelope along with 6 no. loading docks and a level access loading bay located in the warehouse area, internal plant within warehouse, ground level air conditioning units, roof and southern elevation mounted solar panels and back lit elevation signage. Ancillary to the main building a new 6.5m high sprinkler supply storage tank ancillary 3.5m high pumphouse for fire safety is proposed. The proposed development involves the reconfiguration of an existing turning bay with ancillary roadside verge works and road markings, extension of the existing foul sewer and water main public infrastructure, onsite car parking spaces (including disabled spaces and EV spaces) on site cycle parking spaces. The development includes site development and facilitation works including new vehicular entrance, internal drainage infrastructure with connection to existing surface water pipeline, waste and recycling areas, boundary treatments, landscaping, service yards, internal roads, footpaths, lighting, internal gates and fire tender access route
Amendments to the regional distribution warehouse/logistics centre permitted under Ref.: 2422. (A) Alterations to the internal layout, including a reduction in the gross floor area from 3238sq.m to 2583sq.m. (B) Alterations to include the changes to the proposed main building to include first storey ancillary offices, staff facilities and drivers waiting area located on the first floor and (C) Alterations to internal layout to include change of use of warehouse space to truck maintenance area with 3no. service areas to the ground floor of the building envelope. (D) Alterations ancillary to the main building to include a 5.6m high truck wash. The development includes minor alterations to soft and hard landscaping, and permitted car parking layout along with all associated site development works
For a single storey Cardiac Physiotherapy Clinic building, and the provision of all other associated site excavation, infrastructural and site development works above and below ground including ancillary bicycle and car parking, refuse storage area, lighting, new pedestrian access with accessible ramp, footpaths, landscaping and boundary treatments all at
A proposed new single storey side extension to existing dwelling along with all associated site development and facilitating works
A) Construction of 2nr Juvenile grass playing pitches & 1nr Adult grass playing pitch on lands adjoining to the existing club grounds. b) Redistribution of existing soil within site to form a revised level site. Importation of additional inert soil and stones to raise site level by <1m over redistributed soil level within an area of 3.1ha. Haul access via temporary site works access onto existing road at Kilcullen Business Campus. c) Erection of an all-weather 30m x 15m training area with double sided ball wall with flood lights, the ball wall will be 5 metres high and 15 metres wide with a 5m high perimeter fence with 4nr 13m high lighting columns to all weather pitch. d) Community fitness walkway & cycleway with active travel connections to existing neighbouring active transport nodes to the northwest, east and southeast of the subject lands with associated public lighting. e) Alteration/extension of existing car parking to include additional coach and car parking bays. f) Bicycle parking along with site infrastructure works, landscaping works and all associated site development and facilitating works
For the existing structural frame, floor slab, rising walls and foundations. PLANNING PERMISSION to complete the construction of Unit 3 Kilcullen Business Park as granted under Lapsing Planning Permission 02/1195 and 09/472. Along with all associated site development and facilitation works
The brief summarizes the pattern across all 405 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 2422The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief