Applications tied to the site
Partial coverage3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
13% of nearby decided applications were refused. The site check found 842 decisions within 5 km, 3 exact-site or onsite candidate records, and 56 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matched1 of 2 layers are loaded for Westmeath County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedNo verified rural-housing citation is loaded for Westmeath County Council, so this brief makes no current policy claim and relies on decision history.
2 of 4 layers are loaded for Westmeath County Council and were intersected with the site; flood and built heritage are not loaded and no conclusion is drawn for them.
2 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
56 structured nearby appeal records.
56 matchedNo current-dated citation is loaded for Westmeath County Council. Historic references extracted from decisions are never presented as current policy.
Open preview
Open preview
Construction of a free standing single storey bus wash facility, c.162.6m2, plant room c.2m2, water storage tank c.4.37m2 together with associated siteworks
The development will consist of the construction of a new ESB Substation and Bus Eireann Electrical Building and associated ductwork to facilitate the charging of new electric buses.
Internal and external alterations and single-storey extension within enclosed yard to provide enhanced staff welfare facilities, improved public toilets including a new ‘Changing Places’ facility for the disabled, additional fire safety measures and better means of escape at Athlone Railway Station which is a protected structure, RPS ref. 147
A new part one-storey/part two-storey side and rear extension to existing dwelling and all associated site works
The construction of a 2 storey extension to the side and rear of an existing 2 storey private semi-detached dwelling with associated internal and external alterations, and all associated site development works
Hostel accommodation in existing building to include: material alteration to the ground floor to provide access to higher floors, including lift; material alteration to first floor; development of a second floor within the existing structure; changes to façade on Southern Station Road to include additional windows, revised elevational treatment and signage; changes to façade on Ballymahon Road to include additional windows and revised elevational treatment; addition of external escape stairs on northern side elevation and all associated site works
The brief summarizes the pattern across all 842 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 2428The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief