Applications tied to the site
Partial coverage2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
6% of nearby decided applications were refused. The site check found 105 decisions within 5 km, 2 exact-site or onsite candidate records, and 0 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
No structured appeal row is currently tied to the matched decision set.
Historic extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
To demolish existing sheds and erect fully serviced storage unit with connection to existing services, relocate existing fuel pumps and tanks, extend existing yard area, alterations to site boundaries and all associated and ancillary development works. Significant Further Info has been received - NIS.
To erect fully serviced two storey dwelling with detached domestic garage & offices, entrance, sewerage treatment facilities & all ancillary works. Significant further information and revised plans have been submitted.
To erect roofed canopy over existing outdoor play area at the Community Preschool and carry out associated site works
To erect roofed canopy over existing outdoor play area at the Community Preschool and carry out associated site works
EXTENSION OF TIME 15/297 to a) retain alterations to development previously approved under planning reference 07/985 (to include revisions to the location and dimensions of the previously approved developments) and, b) to construct an extension to 1 no. existing pig house, together with all ancillary structures and all associated site works arising from the above development
To construct a new dormer style dwelling house, form new vehicular site entrance onto existing laneway, installation of approved proprietary wastewater treatment system & percolation area, together with all associated site development works
The brief summarizes the pattern across all 105 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 2460021The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief