Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
12% of nearby decided applications were refused. The site check found 109 decisions within 5 km, 1 exact-site or onsite candidate record, and 3 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matched1 of 2 layers are loaded for Leitrim County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedNo verified rural-housing citation is loaded for Leitrim County Council, so this brief makes no current policy claim and relies on decision history.
2 of 4 layers are loaded for Leitrim County Council and were intersected with the site; flood and built heritage are not loaded and no conclusion is drawn for them.
2 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
3 structured nearby appeal records.
3 matchedNo current-dated citation is loaded for Leitrim County Council. Historic references extracted from decisions are never presented as current policy.
Open preview
Open preview
(a) Proposed change of use from existing stables to domestic dwelling unit (aka: barn conversion), with new works to include extension of floor area, remaining under exiting roof, (b) Proposed decommission of existing septic tank and upgrade to new P.I.A. approved EN 12566-3 WWTS c/w Tertiary Treatment Unit & Polishing Filter, as per EPA CoP 2024 guidelines, and (c) Closing up of existing vehicular entrance and provision of a new vehicular entrance.
The partially completed construction of a shed and to apply for permission to complete the shed construction in a steel portal frame cladded with stone and external metal sheeting and all screening landscaping. The completed shed will be used for an ancillary usage to the main existing detached domestic dwelling.
Provide detached building containing domestic garage and hobby room to the side of existing dwelling house
(a) construct a domestic dwelling; (b) construct a domestic garage; (c) construct a new site entrance; (d) construct a new waste water treatment system to current EPA code of practice, together with all ancillary works
Construction of a Dwelling House, Domestic Garage, New Entrance Onto the Public Road, Onsite Wastewater Treatment System with Connections to Services and associated site development works
Of a 3 bay single slatted unit with calving/calf creep area, storage tank, concrete aprons and associated works.
The brief summarizes the pattern across all 109 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 2460250The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief