Applications tied to the site
Partial coverage6 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
6 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
12% of nearby decided applications were refused. The site check found 844 decisions within 5 km, 6 exact-site or onsite candidate records, and 57 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
6 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
6 matched1 of 2 layers are loaded for Westmeath County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedNo verified rural-housing citation is loaded for Westmeath County Council, so this brief makes no current policy claim and relies on decision history.
2 of 4 layers are loaded for Westmeath County Council and were intersected with the site; flood and built heritage are not loaded and no conclusion is drawn for them.
2 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
57 structured nearby appeal records.
57 matchedNo current-dated citation is loaded for Westmeath County Council. Historic references extracted from decisions are never presented as current policy.
Open preview
Open preview
To demolish existing sheds and to construct 2 no semi-detached dwelling houses plus associated site works, landscaping and drainage/services connections
Permission and Retention for development at this site. The development will consist of: i. Retention of the building located to the rear of the site as a Baptist church including a chapel, creche, office and associated uses. ii. Permission for a change of use of part of the existing Baptist church building to a Sunday school and for renovations and a proposed extension to the existing Baptist Church to form a new chapel and associated uses. iii. Permission for a single storey side and rear extension onto the existing parochial house to accommodate the subdivision of the house to provide a one-bedroom self-contained apartment and all associated site works. iv. Demolition of existing mobile home.
RETENTION of a single storey detached shed located to the rear of the existing dwelling and all associated site works
To demolish existing garage and to construct a dwelling house, and all associated site works
Planning Permission for a change of use from a one bedroom living accommodation with bathroom, sitting room & kitchen to garage and all associated site works.
Demolition of existing front extension and construction of replacement front extension and construction of a new roof to the main dwelling to provide first floor accommodation
The brief summarizes the pattern across all 844 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 2460455The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief