Of renovation and alterations of existing derelict dwelling at Main Street, and 4no: 2bedroom single storey semi-detached dwellings to rear of the site accessed via Gaol lane, to include carparking, boundary treatments, ancillary services and all associated site works
Site planning risk brief
Search a place or planning reference, choose the development type, then preview the report before getting the full site brief.Site planning risk brief
Main Street & Gaol Lane , Townsparks , Daingean Co. Offaly
One-off house / within 5 km where a location match is available
Executive snapshot
Local planning pattern
8% of nearby decided applications were refused. The preview found 148 nearby planning records within 5 km where a location match is available.
- Matched source
- 2460482
- Project type
- One-off house
- Coverage
- 5 km radius
Open preview
Top refusal reasons nearby
No reasons on record yet
Open preview
Nearest planning decisions
THE CONSTRUCTION OF 8 NO. TWO STOREY SEMI-DETACHED, 3 BEDROOM TOWNHOUSES, NEW VEHICULAR ACCESS ROADWAY AND ALL ASSOCIATED SITE WORKS AND SERVICES
EXISTING GARAGE OUTBUILDING AND PLANNING PERMISSION FOR PART REMOVAL OF FRONT BOUNDARY WALL FOR NEW FRONT DRIVEWAY WITH ALL ANCILLARY SITE WORKS
AN EXISTING STEEL FRAME CANOPY FORMING AN OUTDOOR COVERED SEATING AREA TO EXISTING PUB WITH ALL ANCILLARY WORKS
A NEW DWELLING HOUSE, NEW SITE ENTRANCE, TREATMENT SYSTEM & PERCOLATION AREA AND ALL ASSOCIATED SITE WORKS
THE DEMOLITION OF EXISTING STRUCTURALLY UNSAFE DWELLING HOUSE AT FRONT OF SITE, TO BE REPLACED WITH 2 NO. PROPOSED 4 BED DWELLING UNITS TO MATCH EXISTING, LOCATED ON SITE OF PREVIOUSLY APPROVED PLANNING PERMISSION REF. 20/563 AND ALL ASSOCIATED SITE WORKS AND SERVICES
The brief summarizes the pattern across all 148 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €49 incl. VAT.
Source match
Matched from public planning record 2460482The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Site-specific risk summary
Included in site brief
Source evidence
Included in site brief
Comparable decision set
Included in site brief