Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
3% of nearby decided applications were refused. The site check found 526 decisions within 5 km, 1 exact-site or onsite candidate record, and 23 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matched1 of 2 layers are loaded for Tipperary County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedNo verified rural-housing citation is loaded for Tipperary County Council, so this brief makes no current policy claim and relies on decision history.
2 of 4 layers are loaded for Tipperary County Council and were intersected with the site; flood and built heritage are not loaded and no conclusion is drawn for them.
2 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
23 structured nearby appeal records.
23 matchedNo current-dated citation is loaded for Tipperary County Council. Historic references extracted from decisions are never presented as current policy.
Open preview
Open preview
The construction of 5 detached commercial buildings as follows: 1 no. aircraft engine maintenance building with associated office space, 1 no. aircraft engine storage facility with associated office space, 3 no. detached warehouse buildings, detached ESB substation, detached security hut, associated car and bicycle parking, internal road network together with connection to the existing business park roadway, site fencing and boundary treatment, connection to foul and storm sewers, connection to watermain and necessary services together with all associated incidental and site works
Construction of a proposed extension with a floor area of 2,786 Sq. meters to N/E of the existing industrial unit, inclusive of car parking, disabled car parking, covered bicycle parking, proposed new entrance, including services and all other associated site works
Demolition of elements of the industrial building and construction of extensions to adapt the existing factory unit for film production. Permission is sought for demolition of: 1. The offices located to the front of the factory building 2. Factory structure sections on the South East and North West side and other sections of the factory building extending above the general factory roofline 3. Pallet storage shed. Permission is sought for: 1. Construction of new 2-storey offices to the front of the factory building 2. 2-Storey replacement extension for actor preparation and dressing areas to the centre Northwest side of the existing factory 3. Extensions to the Northeast side of the factory accomodating 3 film sound stages 4. Advertising signage 5. Upgraded elevation treatments 6. Landscaping and boundary treatments 7. ESB Substation and switchrooms, solar panels, all associated site works 8. General site access improvements into the site from the Lisbunny Industrial Estate road including construction of footpaths and cycle paths, modified vehicular entrances to revised car park with security control cabin (entrance 1), to actor preparation area (entrance 2) and to truck entrance and associated parking area (entrance 3)
(a) construction of new first floor area to incorporate proposed offices, training room, storage areas with associated ancillary areas, (b) installation of new external windows to elevations to serve proposed first floor development, (c) construction of new dock leveller access with associated works to location of existing roller shutter door on south west elevation of existing building, (d) Retention Permission for existing signage and elevational changes with all associated site works and existing connection to all public utilities
A commercial garage on existing serviced site, new entrance and front and rear boundary fence
1) erection of two light industrial buildings ( Unit A & Unit B ) including storage areas, ancillary offices and services areas, 2) erection of new fencing/walls to site boundaries of development site, 3) new vehicular and pedestrian site entrance and exits to both road side boundaries of the development site, 4) all associated site works including gates,fencing, vehicular parking, footpaths, roadways, lighting, foul and surface water, drainage, hard and soft landscaping and all ancillary site works and services connections
The brief summarizes the pattern across all 526 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 2560005The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief