Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
11% of nearby decided applications were refused. The site check found 463 decisions within 5 km, 1 exact-site or onsite candidate record, and 20 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matched1 of 2 layers are loaded for Meath County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedOne current citation from the Meath County Council development plan, with section, page and source URL.
1 matched2 of 4 layers are loaded for Meath County Council and were intersected with the site; flood and built heritage are not loaded and no conclusion is drawn for them.
2 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
20 structured nearby appeal records.
20 matchedCitations are current-dated and carry policy name, section, page and source URL from the Meath County Council development plan.
1 matchedOpen preview
Open preview
A ten year permission for a Solar PV Energy Development with associated Battery Energy Storage System on a site of 74.2 hectares comprising: solar panels on ground mounted steel frames, customer substation, switchgear substations, transformers, inverters, energy storage units, BIC Interface Cabinets (BIC) and BESS Inverters, twin MV transformer skid compacts, monitoring house units, spares containers, BESS intake substation and backup generator, new internal access tracks, new site entrances to the L-2813 public local road and the L-28131 public local road, perimeter security fencing, palisade security fencing, security gates, CCTV system, lighting poles, associated drainage infrastructure, associated ducting and electrical ducting, temporary construction compound, underground cables, landscaping, self-contained composting toilet, and all other ancillary and miscellaneous site works including site clearance, all with a 40 year operational period. As part of a separate Strategic Infrastructure Development (SID) planning application, a 110kV electrical substation with electrical control building and associated compound will be submitted to An Bord Pleanála in due course. A Natura Impact Statement (NIS) has been submitted to the Planning Authority with the application. Significant further information/revised plans submitted on this application
The retention consists of an attached Garage (35.7sqm), Shed (4.9sqm) & Utility Room(2.4sqm) to an existing 3 bed house
Extension to rear of existing house comprising kitchen, utility, bedroom, hall porch, change of front access and all associated site development
The development consists of a 10 year permission and 35 year operation for a solar farm on two sites: North Parcel (Milltown Townland) approximately 41.2 hectares; South Parcel (Moyagher Lower Townland) approximately 80.3 hectares for a total site area of approximately 121.5 hectares. The proposed development on these two sites comprises; Up to 734,000 sq.m of solar photovoltaic panels on ground mounted steel frames, inverter/transformer stations, underground power and communication cables and ducts, boundary security fencing, new internal access tracks, associated drainage infrastructure, new site entrances to the L6835 public local road (North Parcel) and the L8003 public local road (South Parcel), 1 no vehicle passing area on lands adjoining the L6835 local road, CCTV cameras and all associated site services and works. Provision of control building and associated compound within the South Parcel. As part of a separate Strategic Infrastructure Development (SID) planning application, provision of 110KV electrical substation with electrical control building, associated compound with palisade fence and 2 no. overhead line masts, which is to be located within the North Parcel, will be lodged with An Bord Pleanala in due course. A Natura Impact Statement (NIS) will be submitted to the Planning Authority with the Application. Significant Further information/Revised plans submitted on this application
Construction of a two storey dwelling, domestic garage, BAF waste water treatment system polishing filter percolation area, new site entrance and all associated site works
A new entrance gate to access my land. Significant further information/revised plans submitted on this application
The brief summarizes the pattern across all 463 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 2560014The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief