Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
9% of nearby decided applications were refused. The site check found 45 decisions within 5 km, 1 exact-site or onsite candidate record, and 1 structured appeal.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matched1 of 2 layers are loaded for Westmeath County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedNo verified rural-housing citation is loaded for Westmeath County Council, so this brief makes no current policy claim and relies on decision history.
2 of 4 layers are loaded for Westmeath County Council and were intersected with the site; flood and built heritage are not loaded and no conclusion is drawn for them.
2 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
1 structured nearby appeal record.
1 matchedNo current-dated citation is loaded for Westmeath County Council. Historic references extracted from decisions are never presented as current policy.
Open preview
Open preview
The erection of a guyed wind monitoring mast, with instruments, 120 metres in height and all ancillary works necessary for its construction and maintenance, for a period of six years. The purpose of the proposed mast is to assess the suitability of the surrounding area for wind farm development. The application will include a Natura Impact Statement.
Development which will consist of the construction of a two-storey detached dwelling, detached gym, detached domestic garage, proposed entrance on to the private road, proprietary wastewater treatment system and percolation area and all ancillary site works
Erection of a storey and a half style house, domestic garage, install a proprietry waste water treatment system, percolation area to EPA specifications, new site entrance and all necessary associated site works.
Development which will consist of the conversion of the existing garage to a single occupancy community dwelling including changes to exterior elevations, construction of a 2m high fence to form private garden, a new waster water treatment plant and all associated site works
The development will consist of a polytunnel measures 9.44 meters long by 6.7 meters wide by 4 meters height. Doorway 2.43 meters wide and 2.43 meters high.
Permission to construct a one storey dwelling house (170m2) and an accompanying garage (22m2). Permission is also sought for a new domestic entrance on to public regional road and for the installation of a wastewater treatment plant and polishing filter and all associated site works
The brief summarizes the pattern across all 45 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 2560189The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief