Executive snapshot
13% of nearby decided applications were refused. The site check found 178 decisions within 5 km, 1 exact-site or onsite candidate record, and 4 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
4 structured nearby appeal records.
4 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Construction of a Solar PV development, a Battery Energy Storage System facility (BESS) and all ancillary works on a ca. 65.4 ha site consisting of: Solar PV panels laid out in arrays across the Site; A 38kV substation building ((13.8 (l) and 7.4 (w)) and associated compound area, a transformer unit (ca. 5.8m x ca. 8.45m) and associated bund; 192 number Battery Energy Storage System units comprising 22 modules (ca. 3.1m x ca.3.1m); 6 MV Skid/Power Hubs (ca. 9.45m x ca.2.1m), 24 number inverter units (ca. 3m x ca.2.6m); Upgrade of 1 No. existing Site entrance; 1 No. temporary construction compound; Electrical and communications cabling; Pole-mounted security cameras; Perimeter security fencing (2m high) and security gates; Internal access tracks; All associated ancillary development, landscaping and reinstatement works. The operational lifetime of the proposed development will be 40-years. A Natura Impact Statement will accompany the planning application
Temporary period of up to 5 years, of a new electricity double circuit transmission tower approximately 52 metres high at a position located between tower numbers 3 and 4 along the existing 220 kV Donard test (non energised) overhead line (OHL), and it will be used as part of an uprate trial along this test OHL, the permanent replacement of the existing single circuit tower number 3 with a new, upgraded single circuit tower of similar design and dimensions, approximately 35m in height, additional ancillary temporary development includes 3 no temporary pole structures, 2 no line puller / tensioners located either side of the proposed tower, a temporary landmat access road approximately 400m long and 5m wide, hardstanding areas with a combined area of approximately 840 sqm, a self contained pre fabricated site office of area 291 sqm, fencing and all other ancillary site works. The line will remain non-energised for the duration of the trial and following the conclusion of the development
Construction of a two-bedroom, single storey extension, with kitchen, living and dining area, and boot room, to the existing single-storey two-bedroom (with additional home office) bungalow, decommissioning of the of existing septic tank, and replacement with a new foul water treatment system and polishing filter. The proposed extension also includes provision for solar panels, site works including surface water drainage and landscaping, and all ancillary works
Single storey extension with two bedrooms, kitchen-dining area, boot room and bathroom. Decommissioning of the existing septic tank and replacement with new foul water treatment system and polishing filter. Demolishing of existing horse stables, site works, surface water drainage and landscaping
Construction of a one-bed, single storey community dwelling for the use of persons with an intellectual or physical disability or mental illness, addition of 3 car parking spaces & all site works associated with the above-mentioned development
Change of use (removal of condition2 of Planning Reg 04/627) from restricted use to use by all classes of persons
The brief summarizes the pattern across all 178 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 2560247The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief