Applications tied to the site
Partial coverage4 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
4 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
7% of nearby decided applications were refused. The site check found 115 decisions within 5 km, 4 exact-site or onsite candidate records, and 4 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
4 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
4 matched1 of 2 layers are loaded for Clare County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedNo verified rural-housing citation is loaded for Clare County Council, so this brief makes no current policy claim and relies on decision history.
2 of 4 layers are loaded for Clare County Council and were intersected with the site; flood and built heritage are not loaded and no conclusion is drawn for them.
2 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
4 structured nearby appeal records.
4 matchedNo current-dated citation is loaded for Clare County Council. Historic references extracted from decisions are never presented as current policy.
Open preview
Open preview
To construct a granny flat to the rear of an existing dwelling house along with ancillary works
Of an extension to the side of an existing garage/shed along with alterations to the garage/shed, the removal of a site entrance and the construction of a car port and extension to the rear of an existing dwelling along with ancillary works
To convert 2 existing cottages and part of a third cottage into a) 1 no. 2 bedroom apartment and to change door to window on front elevation along with a change of use of the remainder of the third cottage and a fourth cottage for use as a community co-op shop/store along with ancillary works
For: (1) the change of use from residential townhouse as granted permission under Plan Ref. No 24/178 to a wobbler / toddler room, sleep room, two toilets and store on the ground floor. At the first floor an after school, two toilets and storage; (2) new toilets at both levels to be connected to wastewater treatment system granted under Planning Ref. No. 24/178. (3) to demolish existing store adjoining existing creche to the east; and (4) all ancillary site works
For the renovation, alteration and extension of a former public house and the change of use to include both a pre-school, before and after school education and care centre in one part of the buidling, and the renovation and alteration to incorporate a domestic residential townhouse in the remaining part of the former public house. PERMISSION is also sought for a new outdoor play area, staff car parking area, a drop off and set down area, car park for the domestic dwelling, on-site wastewater treatment system and polishing filter and all ancillary site works
For the installation of a domestic waste water treatment system to serve existing dwelling house (former public house known as Dalys Bar) together with all associated site works
The brief summarizes the pattern across all 115 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 2560455The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief