Applications tied to the site
Partial coverage4 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
4 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
6% of nearby decided applications were refused. The site check found 348 decisions within 5 km, 4 exact-site or onsite candidate records, and 14 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
4 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
4 matched1 of 2 layers are loaded for Carlow County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedNo verified rural-housing citation is loaded for Carlow County Council, so this brief makes no current policy claim and relies on decision history.
2 of 4 layers are loaded for Carlow County Council and were intersected with the site; flood and built heritage are not loaded and no conclusion is drawn for them.
2 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
14 structured nearby appeal records.
14 matchedNo current-dated citation is loaded for Carlow County Council. Historic references extracted from decisions are never presented as current policy.
Open preview
Open preview
Retention Permission for temporary prefabricated building to provide 3 nr classrooms No1. Science Room, No2. Construction Studies Room, No3. Home Economics Room and ancillary site works.
The development will consist of the provision of 2 No. prefabricated classroom structures and all ancillary site development works
(1) the phased demolition of existing school buildings, including the phased decommissioning and removal of existing temporary school accommodation units, (2) the phased construction of a new 1- and 2-storey school building, to cater for a total of 750 no. pupils, with a total gross internal floor area of 7,752m2, incorporating 27no. general classrooms and associated support teaching and tech spaces, a special needs unit, a general purpose/dining hall, a library, offices and meeting rooms, and other ancillary accommodation, and to include photovoltaic panels at roof level, (3) the construction of a new, separate sports hall building with a total gross internal floor area of 1097.9m2, incorporating a multi-use hall and associated changing and equipment storage spaces, a fitness suite, a meditation space, general storage spaces, and other ancillary accommodation, (4) the provision of a new grassed sports playing pitch in the western part of the site, 5no. hard surface ball courts to the north of the new school and sports hall buildings, outdoor seating and breakout areas, a special needs unit garden, a tech yard, an external material and bin store (133m2), a new substation and switchroom (24.5m2), Liquid Petroleum Gas (LPG) and Air Source Heat Pump (ASHP) compounds, hard and soft landscaping with footpaths, public lighting, and all associated boundary treatments, (5) modifications to the existing site entrance arrangements to include a minor realignment of the existing vehicular and pedestrian entrance from the south, and the provision of a new, gated pedestrian access from Eastwood to the north, (6) parking and access arrangements to include modifications to the bus set down areas and to the internal road layout, and parking provision for 87no. cars, inclusive of 5no. disabled spaces and 5no. electric vehicle charge points, 125no. sheltered bicycle stands providing 250no. sheltered bike parking spaces, and 10no. uncovered bicycle stands providing 20no. short stay visitor bike parking spaces, (7) new foul and surface water drainage system works incorporating SUDS measures, attenuation, rainwater harvesting, and all other associated site and development works. A Natura Impact Statement has been prepared in respect of the proposed development
For demolition of an existing attached single storey utility/boiler house to the rear of my existing dwelling, construction of a new pitched roof over my existing garage, conversion of my attached garage to habitable use, external alterations, construction of a new single storey extension to the front and rear of my existing dwelling, internal alterations and all associated site works
For the demolition of existing derelict dwelling and the construction of 4 number two storey terraced dwellings with connection to existing on site services with all ancillary site works. This planning application shall include a Natura Impact Statement (NIS).
Construction of 19 number two storey dwellings, connection to and completion of existing on site services, access road and footpaths with all ancillary site works. The planning applications shall include a Site Specific Flood Risk Assessment and Natura Impact Statement (NIS)
The brief summarizes the pattern across all 348 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 17253The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief