Applications tied to the site
Partial coverage5 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
5 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
5% of nearby decided applications were refused. The site check found 880 decisions within 5 km, 5 exact-site or onsite candidate records, and 44 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
5 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
5 matched1 of 2 layers are loaded for Sligo County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedNo verified rural-housing citation is loaded for Sligo County Council, so this brief makes no current policy claim and relies on decision history.
2 of 4 layers are loaded for Sligo County Council and were intersected with the site; flood and built heritage are not loaded and no conclusion is drawn for them.
2 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
44 structured nearby appeal records.
44 matchedNo current-dated citation is loaded for Sligo County Council. Historic references extracted from decisions are never presented as current policy.
Open preview
Open preview
For development consisting of the change of use of 21 executive hotel apartments to student accommodation with minor internal alterations in a detached 3 storey block located to the rear of the Clayton Hotel with all associated site works. The development is located on the grounds and within the curtilage of Protected Structures
Development consisting of demolition of existing industrial/commercial building and to construct a 4-storey student accommodation building comprising 28 no. student apartment units with 104 bedspaces, comms room, laundry, storage facilities, refuse area, carparking area, bicycle parking area, landscaped open space and all ancillary site services
To construct a playground with associated fencing and landscaping
To construct extension to Hotel Executive Apartment Building permitted under planning reference PD30/03 and modified by planning reference PD183/03. The extension will be 3 storey comprising recreation space at ground floor level with accommodation space at first and second floor level
Replacement of 3no. signs and all associated site development works. Sign 1 (4.2m x 0.4m) is a low-level wall mounted illuminated sign at the left hand side of the main entrance. Sign 2 (4.2m x 0.4m) is a low-level wall mounted illuminated sign at the right hand side of the site entrance. Sign 3 (1.4m x 3.5m) is non illuminated triangle totem sign at the main site entrance at
1. Construction of a single storey extension to the north side of the existing school building to contain a single classroom and 4 no. S.E.T. rooms. 2. Connection to existing services on site and all ancillary site works connected with the works mentioned above.
The brief summarizes the pattern across all 880 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 17436The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief