Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
9% of nearby decided applications were refused. The site check found 211 decisions within 5 km, 1 exact-site or onsite candidate record, and 12 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
12 structured nearby appeal records.
12 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
For development consisting of detached two storey dwelling and ancillary site development works. Significant further information and revised plans have been submitted
New pedestrian access, associated site works and alterations to elevation to residential apartment
Of alterations to floor plans, elevations and alterations to site layout of previously approved planning permission and all associated ancillary works.
To convert sitting room to shop unit with new shop front & signage
To 1)partially demolish and convert existing community centre (formerly Erne Ballroom / Palais and protected structure) to 2 no. one-bedroom apartments retaining the front façade of existing building, 2) erect 3 no. two-storey two-bedroom terraced houses, 3) erect 2 no. two-bedroom terraced bungalows (7 units in total) with connection to all public services and all associated site works. These works are to be carried out to protected structure CV44018 Erne Ballroom. Significant further information and revised plans have been submitted
To erect flood lighting, walking track lighting & perimeter fencing along with alterations to existing spectator stand to incorporate W.C. facilities, and RETENTION of existing storage shed and all ancillary works
The brief summarizes the pattern across all 211 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 18170The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief