Applications tied to the site
Partial coverage3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
8% of nearby decided applications were refused. The site check found 655 decisions within 5 km, 3 exact-site or onsite candidate records, and 47 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
47 structured nearby appeal records.
47 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
CONSTRUCTION OF A MAINTENANCE DEPOT WITH WAREHOUSES, ON SITE CAR/TRUCK PARKING AREA, EFFLUENT TREATMENT SYSTEM AND REVISED SITE ENTRANCES AND ALL ASSOCIATED SITE WORKS AND SERVICES
FOR PL2/19/132 CONSTRUCTION OF A MAINTENANCE DEPOT WITH WAREHOUSES, ON SITE CAR/TRUCK PARKING AREA, EFFLUENT TREATMENT SYSTEM AND REVISED SITE ENTRANCES AND ALL ASSOCIATED SITE WORKS AND SERVICES
(A) A NEW TWO-STOREY ADMINISTRATION OFFICE BUILDING. (B) A NEW SINGLE-STOREY WAREHOUSE STORAGE BUILDING WITH ANCILLARY CANTEEN, TOILETS & ADMINISTRATION OFFICE ACCOMMODATION. (C) NEW ESB SUB-STATION AND SWITCH ROOM. (D) ALL ASSOCIATED SITE WORKS TO COMPLETE THE DEVELOPMENT INCLUDING THE FOUL WATER PUMP SYSTEM AND RISING MAIN WITH CONNECTION TO FOUL DRAIN APPROVED UNDER REGISTER REFERENCE 20/435, SURFACE WATER DRAINAGE & ATTENUATION, WATERMAINS, INTERNAL SITE ROADS & FOOTPATHS, BICYCLE SHELTER AND NEW ACCESS ROAD OFF THE L2025
USE OF PART OF SHOP AS OFF LICENCE
THE CONSTRUCTION OF A GRAVITY SEWER LINE AND WASTEWATER PUMPING STATION AT CAPPINCUR INDUSTRIAL ESTATE AND A RISING MAIN TO CONNECT TO THE EXISTING PUBLIC SEWER AT DAINGEAN ROAD, TULLAMORE
THE CONSTRUCTION OF A SINGLE STOREY PORTAL FRAME WAREHOUSE AND ALL ASSOCIATED SITE WORKS
The brief summarizes the pattern across all 655 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 19132The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.