Applications tied to the site
Partial coverage2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
4% of nearby decided applications were refused. The site check found 139 decisions within 5 km, 2 exact-site or onsite candidate records, and 1 structured appeal.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matched1 of 2 layers are loaded for Cavan County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedNo verified rural-housing citation is loaded for Cavan County Council, so this brief makes no current policy claim and relies on decision history.
2 of 4 layers are loaded for Cavan County Council and were intersected with the site; flood and built heritage are not loaded and no conclusion is drawn for them.
2 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
1 structured nearby appeal record.
1 matchedNo current-dated citation is loaded for Cavan County Council. Historic references extracted from decisions are never presented as current policy.
Open preview
Open preview
For a 10 year permission for the erection of a single wind turbine with a maximum height of up to 125 metres and all associated site development, access and reinstatement works; including turbine foundation, hardstanding area, site access track, 1 no. site entrance, electrical switchroom and underground electrical cabling. The proposed development will have a 30-year operational life from the date of commissioning of the wind turbine
For a ten year permission for the erection of a single wind turbine with a maximum height of up to 125 metres and all associated site development, access and reinstatement works; including turbine foundation, hardstanding area, site access track, 1 no. site entrance, electrical switchroom and underground electrical cabling. The proposed development will have a 30-year operational life from the date of commissioning of the wind turbine. Significant further information and revised plans have been submitted
To construct a new two-storey dwelling house with detached domestic garage, form new vehicular site entrance onto public roadway, installation of approved proprietary wastewater treatment system & percolation area, together with all associated site development works
To construct a new dormer style dwelling house with detached domestic garage, form new vehicular site entrance onto public roadway, installation of approved proprietary wastewater treatment system & percolation area, together with all associated site development works
To erect fully serviced part single storey, part storey and half type dwelling, convert existing derelict building into domestic garage & store, upgrade existing entrance, new sewerage treatment facilities & all ancillary works
To construct a slatted house with underground slurry storage tanks and all ancillary site works. Significant further information and revised plans have been submitted
The brief summarizes the pattern across all 139 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 19479The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief