Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
4% of nearby decided applications were refused. The site check found 182 decisions within 5 km, 1 exact-site or onsite candidate record, and 3 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
3 structured nearby appeal records.
3 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
To construct a two storey type dwelling, domestic garage, amend existing agricultural entrance onto the public road to form shared agricultural and domestic site entrance, install proprietary wastewater treatment unit and percolation area and complete all ancillary site works. Significant further information and revised plans have been submitted
For (1) Construction of an agricultural slatted shed to incorporate slatted areas, cubicle accommodation, loose bedded area, feed passage and underground slurry storage tanks and (2) Completion of all associated and ancillary site works. Significant further information and revised plans have been submitted
To construct a two storey type dwelling, domestic garage, formation of new site entrance onto public road, installation of proprietary wastewater treatment unit and percolation area and completion of all ancillary site works
Of alterations carried out to floor plans and elevations to previously permitted development approved under planning Reference Number 18/81 and to include revised location of entrance and all associated site development works- SIGNIFICANT FURTHER INFORMATON HAS BEEN RECEIVED
The material change of use of St. Mary's National School to that of a residential dwelling. Permission is also sought for external alterations to the property, the construction of a single storey extension to the rear, connection to services and all associated site works
For 1. Quarry extension development for rock extraction and associated processing over an area of c. 4 hectares within an overall planing application are of c. 4.9 hectares as previously permitted under P. Ref. 12/101 (P. Ref. 17/383) and never commenced; 2. A time period of 15 years is being sought to allow the previously permitted extraction be completed plus 2 years to complete restoration works (total duration sought 17 years); 3. The development proposed seeks to utilise existing ancillary buildings and facilities including weighbridge, wheelwash, portacabin office/canteen/toilet, waste water treatment system, processing plant, site entrance and all other associated site works, and ancillary activities as currently permitted by P. Ref. 07/827; 4. Final restoration of the worked out quarry to a permanent water body and naturally regenerated wildlife habitat area. An Environmental Impact Assessment Report (EIAR) and Natura Impact Statement (NIS) have been prepared in respect of this planning application. Significant further information and revised plans have been submitted.
The brief summarizes the pattern across all 182 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 1977The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief