Applications tied to the site
Partial coverage2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
13% of nearby decided applications were refused. The site check found 392 decisions within 5 km, 2 exact-site or onsite candidate records, and 30 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
30 structured nearby appeal records.
30 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Permission for development consisting of: The demolition of the existing discount foodstore and boundary wall at the north west of the site; Construction of a replacement, single storey, discount foodstore (including an off-licence sales area) with 104 parking spaces, dedicated electric vehicle parking and cycle parking for 10 bicycles, trolley bay canopy; ESB substation building; Photovoltaic (PV) panels on the roof; New boundary treatment and landscaped area with new pedestrian access points at the north west of the site; Minor amendment to kerbline of the vehicle access layout; All new signage including a "flagpole" sign at the vehicle entrance; All associated site development works including landscaping; drainage including attenuation system, external mechanical plant and other associated and ancillary works to facilitate the development at
To refurbish and extend existing dwelling by way of extension to side of dwelling and incorporating new pitched roof over garage and store, associated works and services at
Permission to: 1. To demolish existing lean to cleaning bay and internal walls of car park, 2. To construct new service bay extension, 3. To relocate existing car wash and carry out all ancillary site development works at
Planning permission to construct warehouse unit and all associated ancillary site works at
To construct two number warehousing units and all associated ancillary site works at
Permission for development consisting of: The change of use from light industry to 'warehouse with ancillary trade counters' (for the sale of building related products principally to trade); Proposed external changes comprise amendments to access in north elevation incorporating new entrance door and ramp; Installation of mechanical plant at north elevation and gate on the existing 2.4 metre fence; Amendments to access in south elevation incorporating new entrance door and ramp; Signage zone; Security bollards on the east elevation entrance and internal installation of trade counters; All other ancillary works to facilitate the development at
The brief summarizes the pattern across all 392 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 20513The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief