Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
3% of nearby decided applications were refused. The site check found 106 decisions within 5 km, 1 exact-site or onsite candidate record, and 4 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
4 structured nearby appeal records.
4 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Construct part single storey / part two storey dwelling, detached domestic garage, new entrance of existing laneway, effluent treatment system, percolation area and associated site works at
EXTENSION OF DURATION OF Planning Reg. No. 17/55; for (a) two storey extension to side of existing club rooms consisting of gym and fitness suite (b) turnstiles and equipment store (c) 8m high wall ball area and associated site works
For (a) two storey extension to side of existing club rooms consisting of gym and entrance lobby at ground floor with fitness suite & dressing rooms on first floor (b) turnstiles and equipment store (c) 8m high wall ball area and associated site works (currently with planning permission under planning reference no. 17/55)
For alterations to previously approved planning permission 22/183 for two storey extension to side of existing club rooms incorporating gym and entrance lobby at ground floor with fitness suite & dressing rooms on first floor, alterations consisting of changes to ground floor linker width, additional meeting room to rear, increased ridge height and alterations to plans/elevations and associated site works at Bawnboy, Ballyconnell, Co. Cavan. (Eircode H14PD28)
For a) demolishing of 3 No. single storey buildings, b) installation of 1 No. 2 storey fully serviced detached modular building consisting of 10 classrooms, including a science room, woodwork room, music room, art room, Special Education Needs classrooms, a central activities room, a multi-sensory room, daily living skills room, admins office and toilet facilities c) additional car parking spaces, connection to existing site services, installation of sensory garden & play area, (c) relocation of ball playing courts, relocation of existing sheltered area, alterations to site layout and all associated site works
To carry out improvement works to existing site entrance with public roadway, to incorporate the following: (1) Removal of brick piers, wing walls, gates and railings to facilitate widened entrance, (2) Minor re-alignment of entrance roadway at junction with public roadway, (3) Construct new public footpath along part of site frontage, (4) Form new pedestrian access to subject site with stepped and sloped approach, (5) Form new set-down area for 'drop-off' areas for cars and minibuses and (6) Provide new staff car parking area, together with all associated site development works
The brief summarizes the pattern across all 106 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 20574The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief