Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
5% of nearby decided applications were refused. The site check found 642 decisions within 5 km, 1 exact-site or onsite candidate record, and 37 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
37 structured nearby appeal records.
37 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
To erect fully serviced dwelling, detached domestic garage, install sewerage treatment unit, percolation area, form entrance/access and all associated works. Significant further information and revised plans have been submitted.
For retention of modular prefabricated single storey building. The building incorporates 12 classrooms, Radio/ Postproduction room, Recording Studio, Art Room, Science Room, Canteen, Sports Theory Room, Staff Room / Offices, Performance Room, Gym and ancillary accommodation / works
Of glass conservatory (12sqm) to side of existing residence
For the removal of existing car wash sump and jet wash unit and the construction of an electric vehicle charging hub and associated infrastructure consisting of the following: (i) installation of 4no. electric vehicle charging bays and 2no. charging units, (ii) new modular sub-unit and CT metering cabinet with mini pillar, (iii) EV banner signage. The proposed development also comprises of new services area along southern boundary and the installation of above ground 4,750 litre Adblue tank along eastern boundary and all other associated site development and surface water drainage works
For change of use from 'office ancillary to motor sales facilities' to 'office use', and all associated works
For (i) A 13sqm extension to the front (new entrance lobby) and a 40sqm extension (dry store) to the rear of the existing service station amenity building, with an ancillary outdoor storage compound of 25sqm in southeast corner enclosed by a 2500mm high security fence; (ii) Modifications to the existing internal floor layout of the service station, incorporating revised and relocated seating, storage and till areas, resulting in an increase in the net retail floor area of 24.8sqm; (iii) Elevational changes including new glazing and access doors and removal of existing signage; (iv) Revisions to existing site layout to include for 10no. car parking spaces, incorporating 2no. EV charging spaces and 2no. disabled spaces, and a pedestrian walkway, and (v) All other associated road tie, boundary treatment and site development works. RETENTION is sought for the existing 50.9sqm extension to the rear and 1 no. food offer (‘Chopped’ 19.5sqm in area) within the permitted retail unit
The brief summarizes the pattern across all 642 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 20597The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief