Applications tied to the site
Partial coverage3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
8% of nearby decided applications were refused. The site check found 149 decisions within 5 km, 3 exact-site or onsite candidate records, and 6 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
6 structured nearby appeal records.
6 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Permission consequent on the grant of outline planning reference 22/15, permission consequent for a new dwelling house and detached garage, new site entrance, boundary and landscaping treatment, new secondary treatment system with polishing filter and ancillary site works as per condition no.2 of the outline permission granted
The development will consist of a new dwelling house and detached garage, new site entrance, boundary and landscaping treatment, new secondary treatment system with polishing filter and ancillary site works.
Retention for development carried out under Pl Ref: 08/5083. Retention sought for location of Bio Tech sewerage treatment plant and percolation area, revision of site boundaries and location of existing bungalow.
Construction of a new single storey type dwelling house, domestic garage, new vehicular entrance, installation of a proprietary wastewater treatment system and soil polishing filter and all associated ancillary site services
Permission for bungalow with proprietary waste water treatment system with raised percolation area and all associated site works
Extension of Duration to construct a dwelling house with treatment system & percolation area with ancillary works
The brief summarizes the pattern across all 149 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 2215The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief