Applications tied to the site
Partial coverage10 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
10 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
16% of nearby decided applications were refused. The site check found 330 decisions within 5 km, 10 exact-site or onsite candidate records, and 34 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
10 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
10 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
34 structured nearby appeal records.
34 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Development which will consist of the sub-division of an existing detached part 2 storey, part single storey dwelling house into 2 no. semi-detached dwelling houses on a common entrance, a ground floor extension to the rear of the property, a 1st floor dormer extension, external modifications to the existing structure including modifications to facades and the existing roof line and all associated ancillary site works. Dwelling house A will be a 3-bedroom semi-detached property, dwelling house B will be a 2-bedroom semi-detached property
This development will consist of the sub-division of the existing site, with modifications and partial demolition of the existing single storey/part two-storey detached 4-bed dwelling to provide a new dwelling house [House B]. Proposed Works are as follows; House A- [the existing dwelling] - Partial demolition of the existing single storey/part two-storey detached 4-bed dwelling, to provide a single storey/part two-storey detached 3-bed dwelling including modifications to the existing external facades and the existing roofline. House B-[the proposed dwelling] - Construction of a single storey/part two-storey detached 3-bed dwelling to include the conversion of part of the existing single storey garage for residential use within the new dwelling. Site Works - Proposed works to include for the modification of the existing single entrance to form a new double entrance to the site, and all associated ancillary works and public service conenctions.
The construction of a steel frame open balcony with glass balustrade to the side of the property at first floor level
Part dormer detached dwelling house and all associated site works
New dwelling house, domestic garage, new vehicular entrance, connection to services and all associated site works
One number fully serviced single storey dwelling together with all associated site works to include new vehicular entrance, driveway, landscaping, boundary treatments
The brief summarizes the pattern across all 330 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 2240The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief