Applications tied to the site
Partial coverage2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
10% of nearby decided applications were refused. The site check found 308 decisions within 5 km, 2 exact-site or onsite candidate records, and 23 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matched1 of 2 layers are loaded for Mayo County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedOne current citation from the Mayo County Council development plan, with section, page and source URL.
1 matched2 of 4 layers are loaded for Mayo County Council and were intersected with the site; flood and built heritage are not loaded and no conclusion is drawn for them.
2 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
23 structured nearby appeal records.
23 matchedCitations are current-dated and carry policy name, section, page and source URL from the Mayo County Council development plan.
1 matchedOpen preview
Open preview
CONSTRUCTION OF A NEW SINGLE STOREY EXTENSION WITHIN THE SCHOOL SITE. THE BLOCK WILL INCLUDE 3 NO. NEW CLASSROOMS, 1 NO. SET ROOM, 1 NO. USER ASSISTED WC/SHOWER AND 2 NO. CLASSROOM BASE SPECIAL NEEDS SUITE AND CIRCULATION. THE DEVELOPMENT WILL ALSO INCLUDE ALL ASSOCIATED SITE WORKS, CONNECTION TO EXISTING SERVICES, REMOVAL OF EXISTING WASTEWATER TREATMENT SYSTEM AND PROVISION OF NEW SYSTEM, RELOCATION OF PLAYING PITCH, NEW FENCING AND ADDITIONAL PARKING SPACES. THIS APPLICATION WILL BE ACCOMPANIED BY A NATURA IMPACT STATEMENT
CONSTRUCT A NEW SINGLE STOREY BLOCK OF PREFABRICATED TEMPORARY ACCOMMODATIO WITHIN THE SCHOOL SITE, CONSISTING OF 2 NO. CLASSROOMS AND SANITARY FACILITIES. THE DEVELOPMENT WILL ALSO INCLUDE ALL ASSOCIATED SITE WORKS AND CONNECTIONS TO EXISTING SERVICES.
Retain granny flat as constructed as overflow accommodation ancillary to the main dwelling with connection to existing proprietary effluent treatment system together with associated site works
Retain granny flat as constructed for short term letting with connection to existing proprietary effluent treatment system together with associated site works
CONSTRUCT A PRIVATE DWELLING HOUSE, PROPRIETARY EFFLUENT TREATMENT SYSTEM AND SOIL POLISHING FILTER TOGETHER WITH ALL ANCILLARY SITE WORKS
1.) the retention of the green house and pergola as constructed, 2.) permission to construct a granny flat and 3.) upgrading the existing septic tank and percolation including all ancillary site works.
The brief summarizes the pattern across all 308 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 22550The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief