Applications tied to the site
Partial coverage5 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
5 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
8% of nearby decided applications were refused. The site check found 127 decisions within 5 km, 5 exact-site or onsite candidate records, and 4 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
5 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
5 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
4 structured nearby appeal records.
4 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Alterations to previous consent 21.673 and permission to complete all works. Retention permission for the alterations to planning file for the Green HQ as granted by the previous consent including a) amendments to all proposed elevations b) variations to side extension c) modifications to all internal layouts and all drainage & ancillary associated site works and Permission to complete all works
CARRYING-OUT OF WORKS (BUILDING, DEMOLITION AND ALTERATIONS) TO THE EXISTING HALL. THE REFURBISHMENT MAKING MATERIAL CHANGES OF ITS USE TO EDUCATIONAL, TRAINING AND EMPLOYMENT RESOURCE AS A GREEN HQ FOR CO OFFALY. VENUE FOR OUTDOOR PUBLIC EVENTS, TWO ACCESSIBLE CAR PARKING SPACES AND E-CHARGING POINT IN EXISTING PARKING AREA; THIS IS BEING PARTIALLY-FUNDED UNDER THE JUST TRANSITION PROGRAMME
CONSTRUCTION OF A NEW RETAIL SHOP UNIT WITH GROUND FLOOR AND MEZZANINE FLOORS, CONNECTION TO PUBLIC WASTEWATER AND CONNECTION TO PUBLIC WATERMAINS AND ALL ASSOCIATED SITE DEVELOPMENT WORKS
EXISTING DOMESTIC GARAGE / FUEL SHED AND ALL ANCILLARY SITE WORKS
A SINGLE STOREY EXTENSION TO THE SOUTH EAST OF THE EXISTING DWELLING INCLUDING ALL ASSOCIATED INTERNAL MODIFICATIONS AND SITEWORKS
CHANGE OF USE OF EXISTING FORMER CONVENT AND ASSOCIATED BUILDINGS TO REHABILITATION UNIT AND ALL ASSOCIATED WORKS ( THE BUILDING IS A PROTECTED STRUCTURE)
The brief summarizes the pattern across all 127 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 2460512The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief