Applications tied to the site
Partial coverage8 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
8 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
9% of nearby decided applications were refused. The site check found 138 decisions within 5 km, 8 exact-site or onsite candidate records, and 2 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
8 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
8 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
2 structured nearby appeal records.
2 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Construction of 1. A new 145m x 90m sports pitch, with 8 no. floodlights (18m high) to the northeast of the site. 2. A viewing stand (stand B) to be located at the new sports pitch, consisting of a toilet block and storage area. 3. A second viewing stand (stand A) to be located at the existing main sports pitch to the south of the site, consisting of a toilet block and storage area. 4. Permission is also sought to connect to the main foul sewage on site and all associated site works
CHANGE OF USE OF EXISTING EQUIPMENT STORE TO A SPORTS HALL AND PERMISSION TO EXTEND BUILDING TO FORM DRESSING ROOMS, SHOWERS, TOILETS ON GROUND FLOOR LEVEL AND MEETING ROOM AT 1ST FLOOR LEVEL
INSTALLATION OF 4 NO. FLOODLIGHTS (18M HIGH) LOCATED TO THE SOUTH OF THE EXISTING FOOTBALL PITCH. PLANNING PERMISSION FOR (1) A TWO STOREY EXTENSION (298.3 SQM) TO THE WEST (REAR) OF THE EXISTING CLUBHOUSE. THE GROUND FLOOR LEVEL WILL INCLUDE A REMOTE OFFICE HUB, KITCHENETTE, PUBLIC W/C'S, STORAGE AREAS, SHOP AND THE UPGRADING OF CHANGING ROOMS WITH SHOWERS AND W/C. FIRST FLOOR LEVEL WILL INCLUDE A GYM AND STUDIO AREA. (2) ALTERATIONS TO BE MADE TO THE EXISTING DOORS AND WINDOWS TO THE WEST, NORTH & SOUTH ELEVATIONS. (3) ALTERATIONS TO THE EXISTING CLUBHOUSE ROOF WILL BE MADE TO FACILITATE THE FIRST FLOOR LEVEL AND THE EXISTING WEST (REAR) EXTENSION (22.1 SQM) WILL BE DEMOLISHED. (4) A NEW 60M BY 35M ALL-WEATHER SPORTS PITCH WITH ARTIFICIAL (ASTROTURF) PLAYING SURFACE, WITH BALL WALL 19M IN LENGTH AND 6M IN HEIGHT, TO THE SOUTHEAST BOUNDARY. (5) PERMISSION IS SOUGHT TO INSTALL 5M HIGH SECURITY FENCING AROUND THE PERIMETER OF THE PROPOSED ASTROTURF PITCH AND 6 NO. FLOODLIGHTS (6M HIGH). (6) PERMISSION IS ALSO SOUGHT FOR TO UPGRADE THE EXISTING CAR PARKING AREAS AND TO INSTALL NEW DRAINAGE, ALONG WITH ALL ASSOCIATED SITE WORKS. (7) PERMISSION IS SOUGHT TO DECOMMISSION THE EXISTING 12M HIGH FLOODLIGHTS AND REPLACE WITH 4 NO. FLOODLIGHTS (18M HIGH) TO THE NORTH OF THE EXISTING FOOTBALL PITCH
ERECTION OF A 24M MONOPOLE TELECOMMUNICATIONS SUPPORT STRUCTURE TOGETHER WITH ANTENNAE, DISHES AND ASSOCIATED TELECOMMUNICATIONS EQUIPMENT, ALL ENCLOSED IN SECURITY FENCING
A DWELLING HOUSE, GARAGE, WASTE WATER TREATMEMT SYSTEM AMD ALL ANCILLARY SITE WORKS.
(A) NEW TWO STOREY FAMILY FARM DWELLING, WITH FIVE BEDROOMS ON AN EXISTING FARM (B) DOMESTIC USE GARAGE (C) CONNECTION TO THE EXISTING DAINGEAN TOWN PUBLIC SEWAGE SYSTEM (D) ENTRANCE THROUGH AN EXISTING RESIDENTIAL GATEWAY (E) ALL ASSOCIATED SITE WORKS
The brief summarizes the pattern across all 138 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 2660015The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief