Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
5% of nearby decided applications were refused. The site check found 183 decisions within 5 km, 1 exact-site or onsite candidate record, and 6 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matched1 of 2 layers are loaded for Mayo County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedOne current citation from the Mayo County Council development plan, with section, page and source URL.
1 matched2 of 4 layers are loaded for Mayo County Council and were intersected with the site; flood and built heritage are not loaded and no conclusion is drawn for them.
4 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
6 structured nearby appeal records.
6 matchedCitations are current-dated and carry policy name, section, page and source URL from the Mayo County Council development plan.
1 matchedOpen preview
Open preview
REHABILITATION AND REMOVAL OF SEDIMENT FROM AN EXISTING OUTFALL PIPELINE AND REPLACEMENT OF OFFSHORE DIFFUSERS
DEMOLISH EXISTING DETACHED DWELLINGHOUSE, CONSTRUCT REPLACEMENT DETACHED DWELLING HOUSE TOGETHER WITH ALL ASSOCIATED SITE WORKS
DEMOLITION OF AN EXISTING 2 STOREY DWELLING AND CONSTRUCTION OF A REPLACEMENT 2 STOREY DWELLING AND ASSOCIATED ANCILLARY WORKS
For the construction of a new dwelling house, effluent treatment plant with associated percolation area, new entrance onto public road, connection to existing services and all associated ancillary site works
CONSTRUCT A DWELLING HOUSE AND SEPTIC TANK/PROPRIETARY EFFLUENT TREATMENT SYSTEM TOGETHER WITH ALL ANCILLARY SITE WORKS AND SERVICES
DEMOLISH EXISTING DETACHED HOUSE, CONSTRUCT REPLACEMENT DETACHED DWELLING HOUSE TOGETHER WITH ALL ASSOCIATED SITE WORKS
The brief summarizes the pattern across all 183 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 18100The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief