Applications tied to the site
Partial coverage6 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
6 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
9% of nearby decided applications were refused. The site check found 876 decisions within 5 km, 6 exact-site or onsite candidate records, and 48 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
6 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
6 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
48 structured nearby appeal records.
48 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Full planning permission is sought to demolish existing single storey garage, full planning permission is sought to construct 8 no. terraced two-storey townhouses with new site entrance, and all associated site works and services.
Retention permission for as built boundary wall and all associated site works
To construct two no. two storey dwelling houses, associated car parking and vehicular entrances, new site boundaries, general landscaping, connection to existing mains water and sewage and all associated site works
Retain (a) change of use from previous domestic garage to an existing bedroom to side of existing two storey dwelling, (b) retain an existing sunroom to the rear of existing two storey dwelling and all ancillary site works. (c) PERMISSION to construct extension to the side of existing two storey dwelling at firest floor level, exterior and interior alterations and all ancillary site works
Construction of an ESB Medium Voltage substation (standard design) to include an adjacent customer switchroom and transformer on a concrete foundation and base, and all associated ancillary works. A Natura Impact Statement (NIS) will be submitted to the planning authority with the application
Permission to construct 18 new houses and all associated site works
The brief summarizes the pattern across all 876 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 18104The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief